Access our library of 121 Business Templates
Wow you’ve unlocked access to our library of 121 business templates.
Get started by checking out some of our top business templates:

Featured business templates

Weekly Schedule Template
Remembering everything you need to do is easy with this weekly schedule template.

Monthly Report
Provide a professional, concise summary of project activities with this monthly report template.

One Page Business Plan Template
This one-page business plan template will help you outline the most important details about your new...
Or, get started by checking out some of our top business templates:
5 Free Business Plans | PDF Templates & Examples
All business plans | pdf business templates..
Showing 1 - 5 of 5

Executive Summary Template

Simple Business Plan Template

Startup Business Plan Template

Strategic Planning
Explore template collections.

Customer Service

Spreadsheets

Get all Business Plans | PDF templates and more.
Business Plan Templates
Free Download
.png)
2 Essential Templates For Starting Your Business. Available as an interactive PDF or a Google Docs template.
With this business plan template, you'll be able to:
- Write a company description that sells your story
- Plan for the future: lay out goals and metrics for success
- Describe your product line in detail and plan for how to stand out from competitors
- Consider any legal formalities that require attention when starting your business
- Put together necessary financial projections to make a strong start
- Create your buyer persona and determine your product/marketing fit

Build A Business Plan That Works
Available as a one-page interactive PDF and a full template on both Google Docs and Microsoft Word!
Whether you’re starting a business or drafting a formalized document with your current business goals, it’s important to clearly defi ne the scope of all aspects of the venture — from mission, to target customers, to fi nances, and beyond.
When just starting out, it can be tempting to think of a business plan as simply your company’s name and a description of your product or service. But in reality, planning a business involves thinking through a lot more details.
In this business plan template we’ll guide you through the steps of writing company and product descriptions, setting sales and marketing goals and plans, and thinking through legal and fi nancial logistics. We've included a plain text, designed , and completed example version of this template.
Frequently Asked Questions (FAQs)
How do you write a business plan.
A business plan is a formal written document that you can use to identify the purpose of your company, make important decisions about your future and help grow your company. HubSpot's free business plan templates provides guidance to establishing your company mission, customer research, competition, and a business strategy to profitability.
Why do I need to fill out the information requested?
We will always keep your personal information safe..
We ask for your information in exchange for a valuable resource in order to (a) improve your browsing experience by personalizing the HubSpot site to your needs; (b) send information to you that we think may be of interest to you by email or other means; (c) send you marketing communications that we think may be of value to you. You can read more about our privacy policy here .
Where can I get a free business plan template?
HubSpot's Free Business Plan Templates are the best way to create a professional, thorough business plan. The templates include instructions and everything you need to know about starting your company.
Is this really free?
Absolutely.
Just sharing some free knowledge that we hope you’ll find useful. Keep us in mind next time you have marketing questions!
What are the basic format of a business plan?
A business plan is a written document that outlines the company's goals, strategy and implementation. The format of the plan varies depending on the type of organization (e.g., for-profit or nonprofit) and size, but most plans share some common features such as an overview, executive summary, and financial information.
What is the best business plan template?
A great business plan template clearly defines the scope of the venture -- from mission, to target customers, to finances, and beyond. HubSpot's business plan template will guide you through the steps of writing company and product descriptions, setting sales and marketing goals and plans, and thinking through legal and financial logistics.
What is needed to start a business?
If you're thinking about starting a business, you'll need to do some research first. You can't just start a business without doing any market research. Market research will tell you if there's an opportunity to turn your idea into a successful business. After that, write your business plan so that you know how much money and time it will take for the project to succeed. Use HubSpot's free business plan template today!
Set yourself up for success with this business plan template
Easily create great, effective landing pages for free
- Why PandaDoc?
- eSignatures
- All use cases
- Enterprise 1001+
- SMB 11-1000
- Microbusiness 1-10
- Customer stories
- Explore all content
- PandaDoc Q&A
- Help center
- Developer center
- HubSpot CRM
- All integrations
- Sales integrations
- CRM integrations
- Payment integrations
Business plan templates
From competitive analysis to financial projections, business plans give your new business a roadmap for success. Download one of our free business plan templates and take your company to the next level.

Laundromat Business Plan
Create your success roadmap with a laundromat business plan template, designed to arrange the essentials of the laundry business.

5-Year Business Plan Template
Empower your path to long-term success with our 5-year business plan template.

Car Wash Business Plan Template
Launch and grow your car wash business with our customizable plan template.

Airbnb Business Plan Template
Unlock your path to success with our Airbnb business plan template, made to guide you in structuring the fundamental aspects of your Airbnb business.

Clothing Line Business Plan
Use this free and customizable clothing line business plan to appeal to investors and set up your fashion brand.

Gym Business Plan Template
The Panda tips in this gym business plan template guide you through the process of researching and presenting information necessary to secure funding and partners for your business.

Handyman Business Plan Template
Start a new handyman business using a well-researched handyman business plan template to meet your goals faster.

Vending Machine Business Plan Template
If you’re starting a new vending machine business, a well-rounded vending machine business plan can improve your chances of success.

Bar Business Plan Template
Create your path to success with our bar business plan template, designed as a valuable tool to help entrepreneurs organize the bar business.

Massage Therapy Business Plan
This massage therapy business plan template helps you cover the basics of starting or expanding a massage business.

Bed and Breakfast Business Plan Template
Use a complete bed and breakfast business plan template to set up your business for growth and success.

Catering Business Plan
Chart your path to success with our catering business plan template designed to help entrepreneurs organize their catering business.

Event Venue Business Plan Template
Launch and grow your event venue with our customizable business plan template.

Event Planning Business Plan
Prepare your event planning business for success with our ready-to-fill and easily downloadable event planning business plan template.

Rental Property Business Plan
Develop a rental property business plan tailored to serve as a valuable resource for entrepreneurs to organize their rental business.

Coaching Business Plan Template
If you want to grow your new or existing coaching business, use our free coaching business plan template as a roadmap to success.

Lawn Care Business Plan
Use a comprehensive lawn care business plan template that includes guidance and all critical information.

T-shirt Business Plan Template
Craft a winning T-shirt business plan in a structured business format that attracts investors and funding.

Candle-Making Business Plan Template
Use a candle-making business plan template to get together all of the information you need to ensure that your candle business succeeds.

SBA Business Plan Template
Use our free and fully customizable SBA business plan template to get started when writing a successful proposal for an SBA loan.

Cleaning Business Plan Template
Discover a hassle-free way to document a roadmap for your cleaning business with this free business plan template.
What is a business plan?
A business plan is a document that helps small business owners determine the viability of their business idea. Combining market research and financial analysis, a professional business plan helps startup CEOs and potential investors determine if the company can compete in the target market.
Typically, a good business plan consists of the following:
- Executive summary
- Company description
- Mission statement
- Product and services
- Marketing plan
- Operations plan
- Management organization
- Financial plan
- Conclusion & appendix
Every section involved in a business plan is designed to help startup businesses reach their target market.
A business plan asks founders and entrepreneurs to detail their business strategy in a step-by-step process that makes sense from an operational perspective. This is essential if a startup is seeking a business loan or an investment from a venture capital firm.
However, even small businesses that are already economically viable can benefit from creating a business plan, since it encourages business owners and their management teams to examine their business model and reevaluate the best ways to reach their target customers.
Should I use a business plan template?
Yes. If you’ve never written one, a business plan can be challenging to write.
Creating a successful plan that you can use to grow your small business can require weeks of market analysis and financial preparation. You may spend time using Microsoft Excel or Powerpoint in order to create documentation which better supports our operational decisions.
However, almost every professional business plan is structured in the same way and most ask for the same information. Because of this, using a business plan template is advisable to save time, money, and effort.
Business plan templates for free
Rather than spending time trying to figure out how to write a business plan , use a free template as a guide to completion.
Business plan templates from PandaDoc can help you reach an effective go-to-market strategy even faster by asking you to provide all the relevant information you need when creating an effective business plan.
Grab a free template to get started!
Frequently asked questions
How many pages should my business plan be.
This depends on the kind of business plan you need to write and how you intend to use the plan that you create.
For example, a plan for a small business seeking potential investors or a business loan will need to provide income statements, cash flow statements, and a balance sheet (usually for a three-year or five-year forecast period).
These financial statements can be omitted if a small business owner isn’t seeking funding and is instead planning to use their business plan as a guiding document for themselves and their management team members.
Some business plans may only run a few pages. Fully-developed business plans can be as long as 50 pages. Much of this depends on the type of business, the operational strategy, and the level of detail that goes into developing the business plan.
Who needs a business plan?
Every business should have a business plan. This is an essential guidance document for any founder or CEO.
Good business plans help a company determine the viability of its place in the market and can help the business develop better strategies for differentiating itself from its competitors.
Business planning also forces business owners to evaluate their marketing strategy, the cost of customer acquisition and retention, and how they plan to grow their business over time.
What is the best business plan template?
Business plans come in all shapes and sizes. The best business plan template for your business is one that you understand and that matches the size and legal structure of your operation.
If you’re a sole proprietor, a business plan template designed for a big corporation probably doesn’t make sense. However, a business plan that helps you build an effective roadmap to grow your business while protecting your intellectual property is a good starting point.
PandaDoc offers specialized business plan templates for common industries along with tips to help you get started with business planning.
Should I hire someone to write my business plan for me?
No. You’ll find freelance writers and business strategy companies out there who are happy to write your business plan for a fee. These resources can guide you through the process, but you should write (or be heavily involved in) the creation of your business plan.
The reason for this is simple: You know the most about your business, and your business needs you to succeed.
A writer can work with you to make your business plan sound better to investors, and a consultant can help you fill in knowledge gaps — like how to conduct a SWOT analysis — and point out weaknesses in your plan. But, at the end of the day, you need to use the business plan to pitch investors and run your business.
Those ideas and guiding principles aren’t something you can outsource.
Should I use business planning software?
Software isn’t required when creating an effective business plan. Most business planning software is designed to help you navigate the outlining and writing process more effectively.
You don’t need software to write a professional business plan, but a solid template can help you get started. Download a free template from PandaDoc today and take your business to the next level.
Get started with PandaDoc today
No credit card required

- PDF Templates
- Fillable PDF Forms
- Sign Up for Free
- PDF Templates /
- Business Plan
Simple Business Plan Templates
Plans, strategies, roadmaps – Businesses rely on these things to gain perspective on what’s about to happen. Milestones laid down in strategic and careful planning for growth and expansion, visions of where the company’s headed 10 years from now, goals that should meet timelines, all these require a smart, prudent and calculated planning.
Whether you’re a startup, an SMB, or close to a Fortune 500, a solid business plan is crucial. And of course, writing business plans is a huge task. But, what if you needed something that requires input from others though? Say, an online form or a PDF template where responses from your colleagues and managers matter? Well, here’s a collection of PDF templates for business planning.
These are beautifully designed templates, specifically tailored for businesses and companies who don’t know where to start. The hard part was already done and that’s designing the template. These will serve as boilerplates for whatever milestone your business needs. You won’t need to worry on building something from scratch, you just need to focus on the content. Some of these templates will contain or collect executive summaries, opportunities, expectations, execution, financial plans, forecasts, the whole nine yards.
Business plan templates help give a clear vision of what lies ahead. They help you get things organized, planned out, and help you check off items from your to-do list more efficiently.

Strategic Plan Template
Focus on the future and keep your company moving forward with Jotform’s Strategic Plan Template. Simply fill in the attached form with your company overview, delve deeper with a SWOT analysis, and finish off by determining your strategic goals, actions, and financial plans. Our fully-customizable template converts submitted information into polished PDFs, which you can download, print, or share instantly.

Single Page Business Plan
Get down to business with a customizable Single-Page Business Plan template from Jotform. Customize your plan in minutes. No coding. Drag and drop to build.

Operational Plan Template
This Operational Plan Sample is structured with important details for your organization. It comes ready to print, but you can simply edit the fields by putting your own organization information.

Marketing Brief Template
Managing a marketing campaign or promotion is a challenging task. You need to have a marketing plan in order to execute the campaign smoothly with the time and budget provided. Creating a Marketing Brief is very beneficial because it summarizes the marketing strategy for a specific campaign.If you are in the advertising agency or part of the marketing department, then this Marketing Creative Brief Template is for you. This well-designed template contains the client information, project information, and the marketing materials that will be used. The project details explain the project title, description, objectives, target audience, budget overview, advertising guidelines, and competitors.

Glamping Business Plan Template
Grab the attention of the investors by using this Glamping Business Plan Template. This business plan is simple yet effective because it contains all the necessary details when building a successful business.

Lean Business Model Canvas Template
See your business from a new perspective with Jotform’s Lean Business Model Canvas Template. Simply fill in a short form with problems your business could solve, how they are currently being solved in the market, and how your company can uniquely work to solve these problems. Our template instantly converts the information into polished PDFs you can download or print for your next big meeting.Our Lean Business Model Canvas Template already looks professional, but you can personalize it further to match your business. Jotform PDF Editor lets you rearrange form fields or add your company logo at the touch of a button! By instantly converting your business model into an accessible PDF format, our Lean Business Model Canvas Template can help you see the bigger picture and determine how to take your business to the next level.

SOP Template
Create a process to organize your employees in managing specific cases or scenarios by using this SOP Template. This template is commonly used in any organization whether it is a small, medium, or large group.

Business Model Canvas Template
Our Business Model Canvas Template includes nine segments which are key partners, key activities, value proposition, customer relations, customer segments, key resources, channels, cost structure, and pricing model.

Creative Brief Template
A Creative Brief is used in advertising, branding, and marketing industries. In order to have a strong and outstanding creative campaign, you need to have a game plan to follow. This serves as a guideline that will help in making decisions related to the campaign.This Creative Brief Template PDF discusses the project details like the project name, due date, and project description. The marketing materials that will be used are listed in the document which includes its specifications like the dimension size, the medium that will be used, and the quantity. This is the best Creative Brief Template you can use for your next creative marketing campaign.

Blog Post Outline Template
Use this Blog Post Outline Template for your blog content in order to get more visitors, followers, shares, and impressions. This template will definitely help your ranking in search engines.

Gym Business Plan Template
Be successful in the gym business that you're building by securing funding or a loan with the help of this Gym Business Plan Template. This PDF can be printed and given to investors or loan applications.

Meeting Minutes Template
Set goals, plan your actions, and update your team members by tracking the team meetings by using this Meeting Minutes Template. This PDF template will surely help the team in terms of planning and productivity.

Memorandum of Understanding Template
Build a harmonious relationship between two or more parties by using this Memorandum of Understanding Template. This template is easy to use and can be customized via the PDF Editor.

Pressure Washing Estimate Template
Create estimates for pressure washing services with the use of web tools. Use this Pressure Washing Estimate PDF template and create instant estimates in PDF format without the trouble of hiring programmers.

Business Hours Template
Announce and let the customers know if your business is open and not by using this Business Hours Template. This PDF template can be customized and personalized by using the PDF Editor.

Custom Sales Funnel Plan

Scope of Work Template
Establish the responsibilities of the service provider by using this Scope of Work Template. This document will show the list of work and tasks that should be performed by the service provider.

Curriculum Vitae
Curriculum Vitae Template will provide you with all the necessary information that you need for your recruitment procedure and automate the job application process of your business.

Preliminary Notice Template
Notify the parties involved like the property owner, hiring party, notifying party, and contractor about the construction project by using this Preliminary Notice Template. This PDF template can be customized if needed via the PDF Editor.

Credit Analysis

Retainer Agreement
Create retainer agreements online. Free, easy-to-customize template. Fill out on any device. Collect e-signatures. Save time with automation tools.

Business Plan Financial Template
Create a business plan financial template with Jotform Sign. Drag and drop to customize. Fill out and e-sign from any smartphone, tablet, or desktop.

Transaction Summary

Code of Conduct Template
Create a professional code of conduct to send to your employees. Can be signed from any smartphone, tablet, or computer. Easy to customize and share. No coding.
What are the seven parts of a business plan?
- Executive summary. This is an overview of your business plan. The executive summary should include your company’s offerings, mission, goals, and projections. Think of it as the elevator pitch for your business plan. If you can’t get investors interested here, it’s unlikely they’ll want to keep reading.
- Company description and history. Describe your business’s legal structure and history in addition to what you do. If you just started this business, you may replace company history with your leadership team’s experience. The purpose of this section is to explain the company structure and build confidence in the people running the company.
- Products and services. Talk about what your company offers, whether that’s products, services, or a combination of the two. Describe your products and services in detail. Explain what makes your offering unique, what your profit margins are, what kind of demand you’re seeing for it, etc.
- Market and competitor research. Investors want to know if there’s demand for your offering. Describe the target market and how your product or service benefits potential customers. Include projections of where the industry is headed over the next few years. Additionally, detail your competitors and how saturated the market is.
- Sales and marketing strategy. This part of the business plan explains how you’ll promote your product. Outline elements such as your ideal customer profile (ICP) as well as your marketing channels, budget, and methods.
- Operations and logistics. Explain how you’ll source materials if you sell products as well as the technology you need to deliver such products and services. Also, provide details about your team, like how many people you’ll need and how you’ll manage employees.
- Financial plan and projections. It’s crucial to prove that your business will be financially viable. For this, you’ll need revenue and expense projections. Many investors want to see sample account statements, balance sheets, and cash flow projections.
How do you write a business plan?
Your business plan should be a realistic roadmap that helps you build a successful company. When writing it, take a balanced approach so that you’re not blind to the potential pitfalls and risks. You’ll draft each of the seven sections previously discussed.
Tackling these sections can be overwhelming, so some people like to start with a one-page business plan that includes short paragraphs for each element. Another way to give yourself a head start is by working from a business plan template. Once you have a good start, you can expand each section to make a compelling case for your business.
Can I write a business plan myself?
Yes, you can. However, depending on your writing experience and goals, you may want outside help. If the business plan is for internal use with the purpose of improving business functions, you’ll likely be OK tackling it alone. But if you’re trying to secure funding from a bank or investors, a professional business plan writer can give you a leg up.
Even if you decide to do it yourself, have a trusted friend or business mentor review your plan and provide feedback. An objective point of view will help you refine your work.
What are the four types of business plans?
- One-page or mini business plan. The one-page option is a great way to improve the focus of your business plan and highlight the essential elements. It can be an effective way to workshop your company’s plan or quickly give others a rundown of your entire business.
- Traditional business plan. The traditional business plan is more in-depth than its one-page counterpart and will be more thorough in each section (often, plans exceed 40 pages). For example, it may contain detailed financials, branding samples, and competitive research documents.
- Business model canvas (BMC). The business model canvas is a more visual representation of your business architecture. It includes sections for infrastructure, offering, customers, finances, etc. Many businesses find the BMC appealing since it can be summarized in a single page.
- Strategic business plan. The strategic business plan can have different purposes, like proving feasibility, discussing planning operations, or projecting growth. It will outline the company’s goals, its strategy for reaching them, and the company structure. The main difference between this and the traditional plan is its focus on specific strategic initiatives.
What are the common mistakes in business plans?
- Poor writing. Sloppy writing may suggest that you’re not serious about your business or you lack the needed professionalism.
- Unrealistic expectations. While you should be optimistic about your business, if your financial projections reflect your hopes more than reality, people may hesitate to back your business.
- Lack of supporting documentation. People reviewing your business plan want to see how you back up your claims. You can include research docs, sample financials, and estimates to make your case.
- Failing to define the target audience. For a successful marketing plan, you need to define your target audience. Investors and financial institutions need to see if you’re confident about who you’re selling to.
- Unbalanced. It’s important to lay out the risks and potential upsides. This analysis shows investors that you’re considering the whole picture regarding your business.
These templates are suggested forms only. If you're using a form as a contract, or to gather personal (or personal health) info, or for some other purpose with legal implications, we recommend that you do your homework to ensure you are complying with applicable laws and that you consult an attorney before relying on any particular form.
Your account is currently limited to {formLimit} forms.
Go to My Forms and delete an existing form or upgrade your account to increase your form limit.
Step-by-Step Guide to Writing a Simple Business Plan
By Joe Weller | October 11, 2021
Link copied
A business plan is the cornerstone of any successful company, regardless of size or industry. This step-by-step guide provides information on writing a business plan for organizations at any stage, complete with free templates and expert advice.
Included on this page, you’ll find a step-by-step guide to writing a business plan and a chart to identify which type of business plan you should write . Plus, find information on how a business plan can help grow a business and expert tips on writing one .
What Is a Business Plan?
A business plan is a document that communicates a company’s goals and ambitions, along with the timeline, finances, and methods needed to achieve them. Additionally, it may include a mission statement and details about the specific products or services offered.
A business plan can highlight varying time periods, depending on the stage of your company and its goals. That said, a typical business plan will include the following benchmarks:
- Product goals and deadlines for each month
- Monthly financials for the first two years
- Profit and loss statements for the first three to five years
- Balance sheet projections for the first three to five years
Startups, entrepreneurs, and small businesses all create business plans to use as a guide as their new company progresses. Larger organizations may also create (and update) a business plan to keep high-level goals, financials, and timelines in check.
While you certainly need to have a formalized outline of your business’s goals and finances, creating a business plan can also help you determine a company’s viability, its profitability (including when it will first turn a profit), and how much money you will need from investors. In turn, a business plan has functional value as well: Not only does outlining goals help keep you accountable on a timeline, it can also attract investors in and of itself and, therefore, act as an effective strategy for growth.
For more information, visit our comprehensive guide to writing a strategic plan or download free strategic plan templates . This page focuses on for-profit business plans, but you can read our article with nonprofit business plan templates .
Business Plan Steps
The specific information in your business plan will vary, depending on the needs and goals of your venture, but a typical plan includes the following ordered elements:
- Executive summary
- Description of business
- Market analysis
- Competitive analysis
- Description of organizational management
- Description of product or services
- Marketing plan
- Sales strategy
- Funding details (or request for funding)
- Financial projections
If your plan is particularly long or complicated, consider adding a table of contents or an appendix for reference. For an in-depth description of each step listed above, read “ How to Write a Business Plan Step by Step ” below.
Broadly speaking, your audience includes anyone with a vested interest in your organization. They can include potential and existing investors, as well as customers, internal team members, suppliers, and vendors.
Do I Need a Simple or Detailed Plan?
Your business’s stage and intended audience dictates the level of detail your plan needs. Corporations require a thorough business plan — up to 100 pages. Small businesses or startups should have a concise plan focusing on financials and strategy.
How to Choose the Right Plan for Your Business
In order to identify which type of business plan you need to create, ask: “What do we want the plan to do?” Identify function first, and form will follow.
Use the chart below as a guide for what type of business plan to create:
Is the Order of Your Business Plan Important?
There is no set order for a business plan, with the exception of the executive summary, which should always come first. Beyond that, simply ensure that you organize the plan in a way that makes sense and flows naturally.
The Difference Between Traditional and Lean Business Plans
A traditional business plan follows the standard structure — because these plans encourage detail, they tend to require more work upfront and can run dozens of pages. A Lean business plan is less common and focuses on summarizing critical points for each section. These plans take much less work and typically run one page in length.
In general, you should use a traditional model for a legacy company, a large company, or any business that does not adhere to Lean (or another Agile method ). Use Lean if you expect the company to pivot quickly or if you already employ a Lean strategy with other business operations. Additionally, a Lean business plan can suffice if the document is for internal use only. Stick to a traditional version for investors, as they may be more sensitive to sudden changes or a high degree of built-in flexibility in the plan.
How to Write a Business Plan Step by Step
Writing a strong business plan requires research and attention to detail for each section. Below, you’ll find a 10-step guide to researching and defining each element in the plan.
Step 1: Executive Summary
The executive summary will always be the first section of your business plan. The goal is to answer the following questions:
- What is the vision and mission of the company?
- What are the company’s short- and long-term goals?
See our roundup of executive summary examples and templates for samples. Read our executive summary guide to learn more about writing one.
Step 2: Description of Business
The goal of this section is to define the realm, scope, and intent of your venture. To do so, answer the following questions as clearly and concisely as possible:
- What business are we in?
- What does our business do?
Step 3: Market Analysis
In this section, provide evidence that you have surveyed and understand the current marketplace, and that your product or service satisfies a niche in the market. To do so, answer these questions:
- Who is our customer?
- What does that customer value?
Step 4: Competitive Analysis
In many cases, a business plan proposes not a brand-new (or even market-disrupting) venture, but a more competitive version — whether via features, pricing, integrations, etc. — than what is currently available. In this section, answer the following questions to show that your product or service stands to outpace competitors:
- Who is the competition?
- What do they do best?
- What is our unique value proposition?
Step 5: Description of Organizational Management
In this section, write an overview of the team members and other key personnel who are integral to success. List roles and responsibilities, and if possible, note the hierarchy or team structure.
Step 6: Description of Products or Services
In this section, clearly define your product or service, as well as all the effort and resources that go into producing it. The strength of your product largely defines the success of your business, so it’s imperative that you take time to test and refine the product before launching into marketing, sales, or funding details.
Questions to answer in this section are as follows:
- What is the product or service?
- How do we produce it, and what resources are necessary for production?
Step 7: Marketing Plan
In this section, define the marketing strategy for your product or service. This doesn’t need to be as fleshed out as a full marketing plan , but it should answer basic questions, such as the following:
- Who is the target market (if different from existing customer base)?
- What channels will you use to reach your target market?
- What resources does your marketing strategy require, and do you have access to them?
- If possible, do you have a rough estimate of timeline and budget?
- How will you measure success?
Step 8: Sales Plan
Write an overview of the sales strategy, including the priorities of each cycle, steps to achieve these goals, and metrics for success. For the purposes of a business plan, this section does not need to be a comprehensive, in-depth sales plan , but can simply outline the high-level objectives and strategies of your sales efforts.
Start by answering the following questions:
- What is the sales strategy?
- What are the tools and tactics you will use to achieve your goals?
- What are the potential obstacles, and how will you overcome them?
- What is the timeline for sales and turning a profit?
- What are the metrics of success?
Step 9: Funding Details (or Request for Funding)
This section is one of the most critical parts of your business plan, particularly if you are sharing it with investors. You do not need to provide a full financial plan, but you should be able to answer the following questions:
- How much capital do you currently have? How much capital do you need?
- How will you grow the team (onboarding, team structure, training and development)?
- What are your physical needs and constraints (space, equipment, etc.)?
Step 10: Financial Projections
Apart from the fundraising analysis, investors like to see thought-out financial projections for the future. As discussed earlier, depending on the scope and stage of your business, this could be anywhere from one to five years.
While these projections won’t be exact — and will need to be somewhat flexible — you should be able to gauge the following:
- How and when will the company first generate a profit?
- How will the company maintain profit thereafter?
Business Plan Template

Download Business Plan Template
Microsoft Excel | Smartsheet
This basic business plan template has space for all the traditional elements: an executive summary, product or service details, target audience, marketing and sales strategies, etc. In the finances sections, input your baseline numbers, and the template will automatically calculate projections for sales forecasting, financial statements, and more.
For templates tailored to more specific needs, visit this business plan template roundup or download a fill-in-the-blank business plan template to make things easy.
If you are looking for a particular template by file type, visit our pages dedicated exclusively to Microsoft Excel , Microsoft Word , and Adobe PDF business plan templates.
How to Write a Simple Business Plan
A simple business plan is a streamlined, lightweight version of the large, traditional model. As opposed to a one-page business plan , which communicates high-level information for quick overviews (such as a stakeholder presentation), a simple business plan can exceed one page.
Below are the steps for creating a generic simple business plan, which are reflected in the template below .
- Write the Executive Summary This section is the same as in the traditional business plan — simply offer an overview of what’s in the business plan, the prospect or core offering, and the short- and long-term goals of the company.
- Add a Company Overview Document the larger company mission and vision.
- Provide the Problem and Solution In straightforward terms, define the problem you are attempting to solve with your product or service and how your company will attempt to do it. Think of this section as the gap in the market you are attempting to close.
- Identify the Target Market Who is your company (and its products or services) attempting to reach? If possible, briefly define your buyer personas .
- Write About the Competition In this section, demonstrate your knowledge of the market by listing the current competitors and outlining your competitive advantage.
- Describe Your Product or Service Offerings Get down to brass tacks and define your product or service. What exactly are you selling?
- Outline Your Marketing Tactics Without getting into too much detail, describe your planned marketing initiatives.
- Add a Timeline and the Metrics You Will Use to Measure Success Offer a rough timeline, including milestones and key performance indicators (KPIs) that you will use to measure your progress.
- Include Your Financial Forecasts Write an overview of your financial plan that demonstrates you have done your research and adequate modeling. You can also list key assumptions that go into this forecasting.
- Identify Your Financing Needs This section is where you will make your funding request. Based on everything in the business plan, list your proposed sources of funding, as well as how you will use it.
Simple Business Plan Template

Download Simple Business Plan Template
Microsoft Excel | Microsoft Word | Adobe PDF | Smartsheet
Use this simple business plan template to outline each aspect of your organization, including information about financing and opportunities to seek out further funding. This template is completely customizable to fit the needs of any business, whether it’s a startup or large company.
Read our article offering free simple business plan templates or free 30-60-90-day business plan templates to find more tailored options. You can also explore our collection of one page business templates .
How to Write a Business Plan for a Lean Startup
A Lean startup business plan is a more Agile approach to a traditional version. The plan focuses more on activities, processes, and relationships (and maintains flexibility in all aspects), rather than on concrete deliverables and timelines.
While there is some overlap between a traditional and a Lean business plan, you can write a Lean plan by following the steps below:
- Add Your Value Proposition Take a streamlined approach to describing your product or service. What is the unique value your startup aims to deliver to customers? Make sure the team is aligned on the core offering and that you can state it in clear, simple language.
- List Your Key Partners List any other businesses you will work with to realize your vision, including external vendors, suppliers, and partners. This section demonstrates that you have thoughtfully considered the resources you can provide internally, identified areas for external assistance, and conducted research to find alternatives.
- Note the Key Activities Describe the key activities of your business, including sourcing, production, marketing, distribution channels, and customer relationships.
- Include Your Key Resources List the critical resources — including personnel, equipment, space, and intellectual property — that will enable you to deliver your unique value.
- Identify Your Customer Relationships and Channels In this section, document how you will reach and build relationships with customers. Provide a high-level map of the customer experience from start to finish, including the spaces in which you will interact with the customer (online, retail, etc.).
- Detail Your Marketing Channels Describe the marketing methods and communication platforms you will use to identify and nurture your relationships with customers. These could be email, advertising, social media, etc.
- Explain the Cost Structure This section is especially necessary in the early stages of a business. Will you prioritize maximizing value or keeping costs low? List the foundational startup costs and how you will move toward profit over time.
- Share Your Revenue Streams Over time, how will the company make money? Include both the direct product or service purchase, as well as secondary sources of revenue, such as subscriptions, selling advertising space, fundraising, etc.
Lean Business Plan Template for Startups

Download Lean Business Plan Template for Startups
Microsoft Word | Adobe PDF
Startup leaders can use this Lean business plan template to relay the most critical information from a traditional plan. You’ll find all the sections listed above, including spaces for industry and product overviews, cost structure and sources of revenue, and key metrics, and a timeline. The template is completely customizable, so you can edit it to suit the objectives of your Lean startups.
See our wide variety of startup business plan templates for more options.
How to Write a Business Plan for a Loan
A business plan for a loan, often called a loan proposal , includes many of the same aspects of a traditional business plan, as well as additional financial documents, such as a credit history, a loan request, and a loan repayment plan.
In addition, you may be asked to include personal and business financial statements, a form of collateral, and equity investment information.
Download free financial templates to support your business plan.
Tips for Writing a Business Plan
Outside of including all the key details in your business plan, you have several options to elevate the document for the highest chance of winning funding and other resources. Follow these tips from experts:.
- Keep It Simple: Avner Brodsky , the Co-Founder and CEO of Lezgo Limited, an online marketing company, uses the acronym KISS (keep it short and simple) as a variation on this idea. “The business plan is not a college thesis,” he says. “Just focus on providing the essential information.”
- Do Adequate Research: Michael Dean, the Co-Founder of Pool Research , encourages business leaders to “invest time in research, both internal and external (market, finance, legal etc.). Avoid being overly ambitious or presumptive. Instead, keep everything objective, balanced, and accurate.” Your plan needs to stand on its own, and you must have the data to back up any claims or forecasting you make. As Brodsky explains, “Your business needs to be grounded on the realities of the market in your chosen location. Get the most recent data from authoritative sources so that the figures are vetted by experts and are reliable.”
- Set Clear Goals: Make sure your plan includes clear, time-based goals. “Short-term goals are key to momentum growth and are especially important to identify for new businesses,” advises Dean.
- Know (and Address) Your Weaknesses: “This awareness sets you up to overcome your weak points much quicker than waiting for them to arise,” shares Dean. Brodsky recommends performing a full SWOT analysis to identify your weaknesses, too. “Your business will fare better with self-knowledge, which will help you better define the mission of your business, as well as the strategies you will choose to achieve your objectives,” he adds.
- Seek Peer or Mentor Review: “Ask for feedback on your drafts and for areas to improve,” advises Brodsky. “When your mind is filled with dreams for your business, sometimes it is an outsider who can tell you what you’re missing and will save your business from being a product of whimsy.”
Outside of these more practical tips, the language you use is also important and may make or break your business plan.
Shaun Heng, VP of Operations at Coin Market Cap , gives the following advice on the writing, “Your business plan is your sales pitch to an investor. And as with any sales pitch, you need to strike the right tone and hit a few emotional chords. This is a little tricky in a business plan, because you also need to be formal and matter-of-fact. But you can still impress by weaving in descriptive language and saying things in a more elegant way.
“A great way to do this is by expanding your vocabulary, avoiding word repetition, and using business language. Instead of saying that something ‘will bring in as many customers as possible,’ try saying ‘will garner the largest possible market segment.’ Elevate your writing with precise descriptive words and you'll impress even the busiest investor.”
Additionally, Dean recommends that you “stay consistent and concise by keeping your tone and style steady throughout, and your language clear and precise. Include only what is 100 percent necessary.”
Resources for Writing a Business Plan
While a template provides a great outline of what to include in a business plan, a live document or more robust program can provide additional functionality, visibility, and real-time updates. The U.S. Small Business Association also curates resources for writing a business plan.
Additionally, you can use business plan software to house data, attach documentation, and share information with stakeholders. Popular options include LivePlan, Enloop, BizPlanner, PlanGuru, and iPlanner.
How a Business Plan Helps to Grow Your Business
A business plan — both the exercise of creating one and the document — can grow your business by helping you to refine your product, target audience, sales plan, identify opportunities, secure funding, and build new partnerships.
Outside of these immediate returns, writing a business plan is a useful exercise in that it forces you to research the market, which prompts you to forge your unique value proposition and identify ways to beat the competition. Doing so will also help you build (and keep you accountable to) attainable financial and product milestones. And down the line, it will serve as a welcome guide as hurdles inevitably arise.
Streamline Your Business Planning Activities with Real-Time Work Management in Smartsheet
Empower your people to go above and beyond with a flexible platform designed to match the needs of your team — and adapt as those needs change.
The Smartsheet platform makes it easy to plan, capture, manage, and report on work from anywhere, helping your team be more effective and get more done. Report on key metrics and get real-time visibility into work as it happens with roll-up reports, dashboards, and automated workflows built to keep your team connected and informed.
When teams have clarity into the work getting done, there’s no telling how much more they can accomplish in the same amount of time. Try Smartsheet for free, today.
Discover why over 90% of Fortune 100 companies trust Smartsheet to get work done.

Original text

Do you want to increase the odds that your business startup will be a success? Download this step-by-step business plan template to lay the groundwork for your new business.
Writing a business plan allows you to carefully think through every step of starting your company so you can better prepare and handle any challenges. While a thorough business plan is essential in the financing process, it's helpful even if you don’t need outside financing.
Creating a business plan can:
- Help you discover any weaknesses in your business idea so you can address them before you open for business
- Identify business opportunities you may not have considered and plan how to take advantage of them
- Analyze the market and competition to strengthen your idea
- Give you a chance to plan strategies for dealing with potential challenges so they don’t derail your startup
- Convince potential partners, customers, and key employees that you’re serious about your idea and persuade them to work with you
- Force you to calculate when your business will make a profit and how much money you need to reach that point so that you can be prepared with adequate startup capital
- Determine your target market and how to reach them
A detailed, step-by-step plan gives you a blueprint you can refer to during the startup process and helps you maintain momentum.
What this business plan template includes
Writing a business plan for a startup can sometimes seem overwhelming. To make the process easier and more manageable, this template will guide you step-by-step. The template includes easy-to-follow instructions for completing each business plan section, questions to help you think through each aspect, and corresponding fillable worksheet/s for critical sections.
After you complete the 11 worksheets, you will have a working business plan for your startup to show your SCORE mentor .
Business plan sections covered in this template:
- Executive Summary
- Company Description
- Products and Services
- Marketing Plan
- Operational Plan
- Management and Organization
- Startup Expenses and Capitalization
- Financial Plan
The Appendices include documents that supplement information in the body of the plan. These might be contracts, leases, purchase orders, intellectual property, key managers’ resumes, market research data or anything that supports assumptions or statements made in the plan.
The last section of the template, “Refining Your Plan,” explains ways to modify your plan for specific purposes, such as getting a bank loan, or for specific industries, such as retail or manufacturing.
Complete the Business Plan Template for a Startup Business to create a working business plan for your startup.
Then, contact a SCORE mentor to review and refine your plan online or in person.
Quick Start Business Plan The aim of this module is to give you the tools, direction and ideas you need to build a business plan. If you're starting a business then a business plan is essential, because it forces you to think through your ideas and options.
10 Business Planning Tips for Starting a Business In this webinar, you'll learn 10 business planning tips to help you start your entrepreneurial journey on the right path.
Business Plan 101: Sales & Marketing The sales and marketing section of your business plan describes how you intend to sell your product. Learn what you should include in this section.
Copyright © 2023 SCORE Association, SCORE.org
Funded, in part, through a Cooperative Agreement with the U.S. Small Business Administration. All opinions, and/or recommendations expressed herein are those of the author(s) and do not necessarily reflect the views of the SBA.


- Customer Reviews
- Net 30 Account
- Wise Services
- Steps & Timeline
- Work at a Glance
- Market Research at a Glance
- Business Plan Writing Services
- Bank Business Plan
- Investor Business Plan
- Franchise Business Plan
- Cannabis Business Plan
- Strategic Business Plan
- Corporate Business Plan
- Merge and Acquisition Business Plan (M&A)
- Private Placement Memorandums (PPM)
- Sample Business Plans
- Professional Feasibility Study
- PowerPoint Presentations
- Pitch Deck Presentation Services
- Business Plan Printing
- Market Research
- L-1 Business Plan
- E-2 Business Plan
- EB-5 Business Plan
- EB-5 Regional Centers
- Immigration Attorneys
- Nonprofit Business Plan
- Exit Business Planning
- Business Planning
- Business Formation
- Business License
- Business Website
- Business Branding
- Business Bank Account
- Digital Marketing
- Business Funding Resources
- Small Business Loans
- Venture Capital
- Net 30 Apply

Frequently Asked Questions
- Business Credit Cards
- Talk to Us 1-800-496-1056
14 Professional Business Plan Examples or Samples
Looking for business plan examples for inspiration? Download or view 14 professional business plans samples, vetted by MBA business plan writers. Available for download in PDF format or read like a book. These plans would help in writing your own business plan.

- Explore Real Business Plan Samples and Examples for Comprehensive Understanding

As an entrepreneur, you may wonder how to attract investors and secure funding by effectively pitching your idea. Additionally, when starting a business, crafting a comprehensive business plan is crucial, but finding relevant examples can be challenging.
To assist you, we provide real-world and sample business plan examples from various industries. A solid business plan is essential for success in the fast-paced world of entrepreneurship as it outlines your goals, strategies, and financial projections, offering a clear direction for your venture.
In this article, we will guide you through the process of crafting an effective business plan, incorporating real-life examples to help you understand the key elements involved. You can find elaborated 14 business plan examples below, available for download and use.
How Can I Write a Business Plan?
1. e-commerce plan sample or example, 2. online marketplace business plan example or sample, 3. snack bar business plan sample / business plan example, coffee shop business plan sample/business plan example pdf, food hall business plan sample/business plan example pdf, printing shop business plan sample/business plan example plan, acquisition business plan sample/ example pdf, l-1 visa business plan sample/ example pdf, e-2 visa business plan sample/ example pdf, eb-5 business plan sample/ example pdf, investor business plan sample/ example pdf, nonprofit business plan sample/ example pdf, bank business plan sample/ example pdf, cannabis business plan sample/ example pdf, detailed overview of key components of a business plan, tips for writing executive summary, tips for writing company description, tips for writing market analysis, tips for writing product and services, tips for writing marketing and sales plan, tips for writing operational planning, tips for writing organization and management summary, tips for writing financial plan, 9. key external drivers, 10. startup summary, 11. projected industry growth, 12. break-even analysis, 13. management summary, 14. financial indicators, discover effective business plan formats and free templates, business plan examples for students pdf, l. one page business plan, ll. start-up business plan, lll. strategic business plan, lv. feasibility business plan, v. internal business plan, conclusion, are you looking for top business plan writer.
To create a robust business plan, ensure inclusion of the following key sections:
- Executive Summary: A brief snapshot of your business and the key highlights of your business plan.
- Product and Services: An elaborate description of the offerings you will provide to your customers.
- Marketing and Sales Plan: A strategic roadmap outlining how you intend to promote and market your business before, during, and after its launch.
- Operating Planning: An explanation of the systems, processes, and tools necessary to efficiently run your business behind the scenes.
- Organization and Management: Organization and management in a business plan outline the structure and leadership of the company.
- Financial Plan: A comprehensive plan mapping out your short-term and long-term financial goals and the associated costs of running your business. If you require funding, this section is where you can outline your request and financial needs.
- Key External Drivers: External drivers encompass factors like outsourcing, economic changes, industry competition, and business legislation complexity.
- Startup Summary: The startup summary offers a comprehensive financial overview of , detailing expenses, asset value, and total requirements, crucial for transparency with entrepreneurs and investors.
- Projected Industry Growth : Projected industry growth forecasts the sector’s expansion, offering a 10-year perspective and average annual growth rate, providing clarity to investors.
- Break-even analysis: The break-even analysis visually presents key metrics and a 12-month revenue forecast to help stakeholders grasp the point where the business covers costs and starts generating profit .
- Management Summary: The management summary provides a concise overview of organizational structure, key personnel, their roles, and financial commitments, ensuring stakeholders understand the business’s operational strength and leadership capability.
- Financial Indicators: The financial indicators section evaluates organizational fiscal health, focusing on year-over-year profitability metrics, leverage ratios, liquidity ratios, and additional metrics, providing a comprehensive understanding of the business’s financial performance and efficiency in revenue generation from equity investments.
Overview of Diverse Business Plans:Quick Insights and Highlights

Something borrowed something new is an emerging e-Commerce business providing wedding accessories and personalized gifts. This drop shipping business model has the potential to take the market by storm.
In addition, social networking and blogging may be used to drive awareness and interest, giving something old and something new a comprehensive online marketing model.

Our snack bar business plan sample includes a detailed description of the products and services offered, as well as a market a nalysis and competitive analysis.
It also includes a financial plan that outlines the startup costs, revenue projections, and break-even analysis. We like this sample plan because it demonstrates how to build a profitable snack bar business by creating a unique menu and offering healthy, high-quality snac ks that meet custome r demand.
Your snack shop business plan can look as polished and professional as the sample plan. It’s fun and easy, with Wise Business Plan. Let’s review the snack shop business plan sample and adjust them according to your audience for the best results.

A coffee shop business plan is a document that outlines what your business idea is and how it will be implemented. Its purpose is to answer questions such as what it costs to start a coffee shop, how these costs will be financed, and how much money you can expect to earn from your cafe.
Are you looking for the right business plan for your cafe? Let’s review the Coffee shop business plan sample to find out how cloud-based software can make your day-to-day work more efficient.
Our coffee shop business plan sample includes a detailed description of the products and services offered, as well as a market analysis and competitive analysis.
It also includes a financial plan that outlines the startup costs, revenue projections, and break-even analysis. We like this sample plan because it demonstrates how to build a profitable coffee shop business by creating a unique brand and offering high-quality products a nd customer service.

It is important to remember that the business plan template can be customized to meet your company’s specific needs and requirements. It will help showcase your business as a leader in the modern industry.
This food business plan template provides key slides to showcase everything from finances to marketing and key competitors. If you prefer, you can alter the content displayed to meet your specific needs, but this is a good starting point.
Ultimately, this food house business plan will be suitable for any business operating in the food industry and keen to get interested from key individuals. It will ensure that you can build up the rep of your company.
We provide a one-of-a-kind sales pitch deck designed to appeal to your prospective audience, as well as a custom presentation tailored to their information requirements.

When establishing a think tank, you will need to develop a business plan and document it properly. As a mass think tank, you need a special strategy to legalize the think tank as a non-profit organization and to raise funds for your project successfully.
Copy and print businesses offer a variety of services to both businesses and consumers. A copy and print shop can handle everything from single-page printing to large-volume jobs using several types of media.
Our printing shop business plan sample includes a detailed description of the products and services offered, as well as a market analysis and competitive analysis. It also includes a financial plan that outlines the startup costs, revenue projections, and break-even analysis. We like this sample plan because it demonstrates how to build a profitable printing shop business by offering high-quality, customized printing services with a focus on customer s ervice and efficient operations.
Let’s take a look at Printing and Photocopy Business Plan Sample that you can use to inspire your own and easily create one.

Acquiring another company or merging with a competitor can be a complex process, but Wise Business Plans can help you navigate it with ease. Our acquisition business plan sample includes an analysis of the target company, a valuation, and a strategy for integrating the acquired business into your existing operations, providing a clear roadmap for success.
The acquisition business plan sample is intended for businesses seeking to acquire another company or merge with a competitor. This plan includes an analysis of the target company, a valuation, and a strategy for integrating the acquired business into the existing operations. We like this sample plan because it provides a clear roadmap for the acquisition process and demonstrates the potential benefits of the deal.

At Wisebusinessplans, we understand that obtaining an L1 visa for an executive or manager requires a thorough and compelling business plan.
Our L1 business plan sample includes all the necessary components to satisfy USCIS requirements and demonstrate your qualifications and your company’s viability in the US market.
The L1 business plan sample is a comprehensive plan for a new business seeking L1 visa approval for an executive or manager. This plan focuses on demonstrating the applicant’s qualifications and the company’s viability in the US market.
We like this sample plan because it is specific to the L1 visa process and includes all the necessary components to satisfy USCIS requirements.

If you’re an entrepreneur seeking E-2 visa approval, Wise Business Plans can help you create a persuasive business plan.
Our E-2 business plan sample outlines your investment, business operations, and financial projections, providing a clear and compelling case for your ability to successfully run a business and make a significant economic impact.
The E-2 business plan sample is designed for entrepreneurs seeking E-2 visa approval, which allows individuals to invest in and manage a business in the United States. This plan outlines the applicant’s investment, business operations, and financial projections. We like this sample plan because it provides a clear and compelling case for the applicant’s ability to successfully run a business and make a significant economic impact.

If you’re looking to obtain an EB-5 visa by investing in a new commercial enterprise in the United States, Wise Business Plans can help you create a compelling business plan.
Our EB-5 business plan sample includes a description of your business, a market analysis, and financial projections, providing a detailed and persuasive case for the potential success of your venture.
The EB-5 business plan sample is designed for individuals seeking to obtain an EB-5 visa by investing in a new commercial enterprise in the United States. This plan includes a description of the business, a market analysis, and financial projections. We like this sample plan because it provides a detailed and persuasive case for the potential success of the business, which is crucial for obtaining EB-5 visa approval.

If you’re seeking investment from angel investors, venture capitalists, or other private equity firms, Wise Business Plans can help you create a compelling pitch.
Our investor business plan sample includes a pitch deck, financial projections, and a detailed analysis of the market opportunity, emphasizing the potential return on investment and the scalability of your business.
The investor business plan sample is intended for businesses seeking to attract investment from angel investors, venture capitalists, or other private equity firms. This plan includes a pitch deck, financial projections, and a detailed analysis of the market opportunity. We like this sample plan because it emphasizes the potential return on investment and the scalability of the business.

At Wisebusinessplans, we’re committed to helping non-profit organizations achieve their social impact goals.
Our non-profit business plan sample includes a mission statement, programs and services, marketing and outreach strategies, and a financial analysis, providing a clear roadmap for establishing or expanding your organization.
The non-profit business plan sample is designed for organizations seeking to establish or expand a non-profit entity. This plan includes a mission statement, programs and services, marketing and outreach strategies, and a financial analysis. We like this sample plan because it demonstrates a strong commitment to social impact and outlines a clear strategy for achieving the organization’s goals.

Whether you’re seeking financing from a bank or other financial institution, Wise Business Plans can help you create a detailed and persuasive business plan.
Our bank business plan sample includes a thorough financial analysis, market research, and a strategy for achieving profitability, highlighting the key factors that banks consider when evaluating loan applications.
The bank business plan sample is tailored for businesses seeking financing from a bank or other financial institution. This plan includes a detailed financial analysis, market research, and a strategy for achieving profitability. We like this sample plan because it highlights the key factors that banks consider when evaluating loan applications, and provides a strong case for the borrower’s ability to repay the loan.

The cannabis industry is rapidly growing, and Wise Business Plans can help you enter it with confidence.
Our cannabis business plan sample includes a market analysis, operational strategy, and regulatory compliance plan, providing a comprehensive overview of the unique challenges and opportunities in the industry and offering a clear roadmap for success.
The cannabis business plan sample is tailored for entrepreneurs seeking to enter the rapidly growing cannabis industry. This plan includes a market analysis, operational strategy, and regulatory compliance plan. We like this sample plan because it provides a comprehensive overview of the unique challenges and opportunities in the cannabis industry, and offers a clear roadmap for success.
1. Executive Summary
The executive summary is a concise overview of your business plan, highlighting the key points of each section. It should capture the essence of your business, its mission, and the purpose of the business plan. This section should be written last, but it’s placed at the beginning of the business plan. Here is an example executive summary from our professional business plan written for Eplace Solution , an innovative e-commerce portal.

- Keep it brief and focused on key points.
- Clearly define the problem and your solution.
- Highlight market opportunities and growth potential.
- Showcase your team’s qualifications.
- Include financial projections.
- End with a clear call to action.
- Tailor it to your audience.
- Review and update regularly.

2. Company Overview or Description
In this section, provide a detailed description of your company, including its history, legal structure, location, and vision. Explain your mission statement and core values that guide your business decisions. Use real-life examples of successful companies and how their strong company descriptions have contributed to their growth. In addition, you can reuse your company description on your About page, Instagram page, or other properties that ask for a boilerplate description of your business.
This section also allows you to describe how you register your business . Here you must choose whether your business is a corporation, sole proprietorship, LLC , or another type of business .

- Describe your company’s mission and vision.
- Explain what your business does and the problems it solves.
- Mention your target market and customer base.
- Highlight your unique selling points.
- Provide a brief history and background.
3. Market Analysis
A market analysis analyzes how you are positioned in the market, who your target customers are, what your product or service will offer them, and industry trends. It might be useful to do a SWOT analysis to discover your strengths and weaknesses to identify market gaps that you may be able to exploit to build your business.
As part of your market research, you’ll also need to perform a competitive analysis. It will give you an idea of who your competition is and how to differentiate your brand. Here’s an example of a competitive analysis we did for a food business.

- Research and understand your industry thoroughly.
- Identify market trends and growth opportunities.
- Analyze your competitors and their strengths and weaknesses.
- Define your target audience and their needs.
- Include data and statistics to support your analysis.

4. Product and Services
Adding products and services to a business plan involves more than listing your company’s offerings. If you intend to gain funding or partner with another business, your products, and services section needs to demonstrate your company’s quality, value, and benefits.
Here’s an example of a product and service section in the business plan we wrote for an e-commerce business that offers wedding accessories.

- Clearly describe your offerings and their features.
- Explain how your products/services address customer needs.
- Highlight any unique qualities or advantages.
- Discuss your pricing strategy.
- Mention any future product/service development plans.
Here is example of services section of a bank.

5. Marketing and Sales Plan
It is always a good idea to have a marketing plan before launching your business. A potential investor will want to know how you will advertise your business. Therefore, you should create a marketing plan that explains your planned promotion and customer acquisition strategies.
Discuss how you will make a sale. How will you attract customers and maximize their lifetime value? Ensure your marketing and sales forecasts align with your financial forecasts Marketing plans are usually based on the four Ps : product, price, place, and promotion. Breaking it down by marketing channels makes it easier. Discuss how you intend to market your business via blogs, email, social media, and word-of-mouth. Here is an example of marketing strategies we develop for a restaurant business.

- Define your marketing goals and objectives.
- Outline your marketing strategies, including channels and tactics.
- Explain your sales strategy and target sales goals.
- Include a budget for marketing and sales activities.
- Discuss your sales team and their roles.
- Detail your customer acquisition and retention strategies.
- Mention any partnerships or collaborations for marketing and sales.
Example of marketing and sales plan section of a bank

6. Operation Planning
The operation plan should include all the steps needed to run the business in the long run. The plan should include details about logistics, duties for each department of the company, and responsibilities for the team.
The main aspect of running a business is its costs. Whether it’s machinery or services, each requires capital.
Pro Tips: Learn how to write an operation plan in a business plan
- Describe your day-to-day business operations.
- Explain your supply chain and production processes.
- Outline your facility and equipment requirements.
- Discuss your quality control and efficiency measures.
- Mention any legal and regulatory compliance considerations.
- Detail your staffing and management structure.
- Include contingency plans for potential disruptions.
7. Organization and Management
In this section, you can describe your current team and the people you need to hire. You will need to highlight your team’s relevant experience if you intend to seek funding. Basically, this is where you demonstrate that this team can be successful in starting and growing the business.

- Introduce your leadership team and their roles.
- Highlight their relevant experience and qualifications.
- Explain your organizational structure and hierarchy.
- Discuss key personnel responsibilities and functions.
- Mention any plans for team growth or development.
- Address any advisory boards or external support.
Management summary of coffee shoppe business.

8. Financial Plan
A financial plan should include sales and revenue forecasts, profit and loss statements , cash flow statements , and balance sheets .
Now, if you plan to pitch investors or submit a loan application, you’ll also need a “use of funds” report. Here you outline how you plan to leverage any funding you might acquire for your business.
With our business templates , you can create your own income statement, cash flow statement, and balance sheet.

- Include detailed financial projections (income statement, cash flow, balance sheet).
- Explain your funding requirements and sources.
- Discuss your pricing and revenue model.
- Describe your expense management and cost controls.
- Mention any financial risks and mitigation strategies.
- Highlight key financial milestones and goals.
Financial highlights of foodShack business.

External drivers refer to the external factors or influences that significantly impact the activity and growth of an industry. These drivers include outsourcing of non-core activities, changes in economic activity, competition from other industries, and the complexity of business legislation.
Additionally, external drivers encompass the effects of changes in new business formation, especially among small businesses, which directly affect the demand for services within the industry.

Tips for writing key external drivers
- Identify and analyze current and emerging market trends in your industry.
- Assess potential positive or negative impacts these trends may have on your business.
- Evaluate broader economic conditions, including inflation rates, interest rates, and GDP growth.
- Elucidate how changes in economic conditions could influence consumer behavior, product demand, and overall cost structure.
- Outline key industry regulations and compliance requirements, discussing potential impacts on operations, costs, and market access.
- Highlight relevant technological advancements and explain their potential effects on your product or service offerings, operations, and competitiveness.
- Analyze current and potential future competitors, emphasizing the evolving competitive landscape’s impact on market share, pricing strategy, and overall business strategy.
- Consider social and cultural factors influencing consumer preferences and behaviors, exploring how societal changes can affect product demand.
- Evaluate environmental trends and regulations, discussing potential impacts on operations, supply chain, and customer perceptions.
- Assess political stability, government policies, and geopolitical factors, exploring potential risks and opportunities from political changes.
- Discuss global market conditions, analyzing how global economic trends, trade policies, and currency fluctuations may affect operations and expansion plans.
- Identify and discuss potential risks in the supply chain, such as disruptions, shortages, or geopolitical issues.
- Consider demographic shifts affecting your target market and discuss how changes may impact your customer base and marketing strategies.
- Highlight key legal and regulatory factors affecting the business, discussing potential legal challenges, compliance costs, and regulatory changes.
- Outline comprehensive risk management strategies, including contingency plans and risk mitigation strategies.
- Explain how you will monitor external drivers and emphasize the importance of staying agile and responsive to changes in the external environment.

The startup summary serves as a comprehensive overview of essential financial aspects, encompassing total startup expenses, the overall value of startup assets, and the total requirements, which is the cumulative sum of all expenses and startup investments.
It provides a clear financial snapshot, outlining the costs involved in launching the business, the value of assets acquired, and the overall financial needs for the startup.
This section is crucial for entrepreneurs and potential investors, offering a transparent understanding of the financial foundation required to initiate and sustain the business successfully.
This roadmap ensures a realistic evaluation of the business idea, identifying potential challenges and offering solutions.To write an effective plan, focus on what sets your venture apart from competitors, maintain conciseness, and embrace flexibility as a living document.
Answer fundamental questions about your business, create actionable checklists, execute the plan, and continually revise and update based on experiences and feedback.This iterative process fosters continuous improvement, helping entrepreneurs stay adaptable and enhance their business strategies over time.

Tips for writing Startup Summary
- Clearly state the startup’s name and provide a concise description of its activities.
- Include a succinct mission statement capturing the startup’s purpose and goals, reflecting its core values.
- Specify the founding date and offer brief bios of key founders, highlighting relevant experience.
- Summarize the startup’s concept, explaining offered products or services and key distinguishing features.
- Clearly articulate the problem or need in the market that the startup addresses, defining the target audience.
- State what makes the startup unique, whether it’s a special feature, market gap, or competitive advantage.
- Provide a brief description of the market opportunity, covering target market size, trends, and growth prospects.
- Outline how the startup plans to generate revenue, detailing streams, pricing strategy, and potential partnerships.
- Offer a snapshot of the startup’s current status, highlighting key achievements such as product development or partnerships.
- If seeking funding, clearly state the amount sought and its allocation, covering areas like product development and marketing.
- Include a high-level financial summary with key projections for revenue, expenses, and profitability.
- Briefly outline future aspirations and plans, encompassing areas like expansion, product development, or strategic partnerships.
The projected industry growth is a pivotal aspect that forecasts the expansion of a specific sector over a defined timeframe.
For instance, it could provide an estimate of where that particular business will be standing in the next 10 years, and what will be the average annual growth rate of that industry.
This information provides prospective investors and stakeholders with a clear understanding of the industry’s potential and positions the startup within a dynamic and flourishing market.

Tips for writing Projected Industry Growth
- Emphasize the importance of industry trends and growth to your business.
- Provide a concise overview, including market size, major players, and recent trends.
- Briefly explain how you gathered data on industry growth projections (e.g., market research reports, expert interviews).
- Identify and discuss prevailing trends, such as technological advancements, changes in consumer behavior, and regulatory shifts.
- Summarize the industry’s historical growth, highlighting growth rates, market expansion, and notable milestones.
- Highlight key factors expected to drive industry growth, such as emerging markets, technological innovations, and demographic shifts.
- Discuss specific opportunities within the industry, including gaps in the market, underserved segments, or areas of competitive advantage.
- Acknowledge potential challenges or risks that could impact industry growth, demonstrating a realistic understanding.
- Present projections for future growth rates based on historical data, expert opinions, and your analysis. Include short-term and long-term projections.
- Discuss how key competitors are positioned to leverage industry growth, emphasizing your business’s differentiation strategies.
- Consider the regulatory landscape impacting growth, discussing anticipated changes and their potential effects on the industry.
- Explore international trends and their implications for industry growth, including factors like global economic conditions and geopolitical influences.
Here is example of market analysis section of a bank.

The break-even analysis serves as a vital financial tool, offering a detailed estimation of key metrics such as Sales Revenue, Cost of Sales, Gross Profit, Fixed Expenses, and Income Before Tax.
These critical components are visually presented through a bar graph, providing a clear and concise overview of the financial dynamics.
Additionally, the break-even analysis delves into a 12-month forecast, outlining the projected amount of revenue generated and the corresponding fixed costs.
This section is instrumental in helping stakeholders understand the financial threshold at which the business covers its costs and begins to generate profit.

Tips for writing Break-even Analysis
- Define break-even analysis as a financial calculation where total revenue equals total costs.
- Identify constant costs regardless of production or sales levels.
- Enumerate and explain costs changing with production or sales.
- Present the break-even analysis formula, indicating the units needed to cover costs.
- Perform a practical break-even calculation using business-specific fixed costs, selling price, and variable cost per unit.
- Include a break-even chart or graph for a visual understanding of cost-revenue dynamics.
- Conduct a proactive sensitivity analysis to explore how changes in variables impact the break-even point.
- Specify the anticipated timeframe to reach the break-even point in terms of months or units sold.
- Clearly outline assumptions made in the analysis and provide justifications for transparency and credibility.
- Acknowledge potential risks or challenges that may affect the accuracy of the break-even analysis.
- Briefly mention contingency plans for difficulties in reaching the break-even point within the projected timeframe.
The management summary within the business plan provides a concise overview of the organizational structure and key personnel.
This includes a count of individuals, specifying the number of founders and operational team members integral to the organization.
The summary delves into the roles and responsibilities of each key figure, offering insights into the leadership dynamics driving the business.
Furthermore, the management summary sheds light on the financial aspect by presenting details about personal wages and payroll allocations for both founders and operational staff.
This comprehensive section ensures a clear understanding of the human resource framework and the financial commitments associated with the management team, crucial for stakeholders evaluating the business’s operational strength and leadership capability.

Tips for Writing Management Summary
- Highlighting the critical role the management team plays in the business’s success, the introduction emphasizes their significance.
- Listing each key member with names, positions, and brief role summaries introduces the core of the management team.
- Providing brief biographies for each team member underscores their relevant experience, skills, achievements, and industry-specific expertise.
- Clearly outlining roles and responsibilities emphasizes how each team member’s skills contribute to the overall success of the business.
- Sharing the team’s vision and strategy involves discussing key strategic goals and outlining the plans to achieve them.
- Highlighting notable achievements or milestones showcases the team members’ successful ventures, industry recognition, or career accomplishments.
- Discussing team dynamics emphasizes collaboration and the complementary nature of their skills in driving the business forward.
- Introducing advisory board members, if applicable, underscores the additional guidance and expertise they bring to the business.
- Discussing how the team plans to contribute to future growth and development includes strategies for talent acquisition, leadership development, and succession planning.
- Touching on the team’s culture and values emphasizes their role in shaping the overall ethos of the business.
- If seeking investment, briefly mentioning how the management team plans to use funding for business growth and development provides insight into their financial strategy.
Here is example of marketing and sales plan section of a bank.

The financial indicators section within the business plan helps in evaluating the fiscal health and performance of the organization.
Year-after-year profitability estimates take center stage, encompassing key metrics such as gross margin, net profit margin, and EBITDA to revenue.
These indicators provide a comprehensive understanding of the business’s ability to generate profit relative to its revenue.
Furthermore, the financial indicators extend to leverage ratios, including the critical Debt to Equity ratio, Debt to Assets ratio, and Interest Coverage ratio.
These metrics illuminate the organization’s capital structure, debt management, and its capacity to meet interest obligations.
Liquidity ratios includes the Current Ratio and Current Debt to Total Asset Ratio.
These ratios provide insights into the company’s short-term financial health and its ability to meet immediate obligations.
The financial indicator toolbox is enriched with additional metrics, notably the Revenue to Equity ratio, which sheds light on the efficiency of generating revenue from equity investments.

Tips For Writing Financial Indicators
- Detailed revenue forecasts for the next 3-5 years. Breakdown by product/service and geographical regions.
- Detailed breakdown of anticipated expenses. Include fixed and variable costs, operational expenses, and other relevant expenditures.
- Historical P&L statements if available. Projected future profits and losses based on revenue and expense projections.
- Outline of expected cash inflows and outflows. Emphasis on the ability to meet short-term obligations.
- Snapshot of the company’s financial position. Includes assets, liabilities, and equity.
- Calculation and presentation of key financial ratios (liquidity, solvency, profitability). Discussion on the significance of these ratios.
- Identification and explanation of relevant KPIs. Highlighting alignment with the overall business strategy.
- Discussion of potential financial risks. Mitigation strategies and addressing uncertainties.
- Clear statement of the amount and purpose of funds required.
- Outline of key assumptions underlying financial projections. Rationale for these assumptions.
- Summary of industry financial trends and business positioning. Outlook on future financial prospects considering market dynamics.

Looking For The Right Business Plan Format?
These sample business plans will provide you with a complete structure and format for your business plan, which will give you a head start on developing your document, so you won’t be stuck seeing an empty page and wondering what to write.
Simply going through the process of writing a business plan is one of its key benefits. If you sit down to write, you’ll naturally think about your startup costs, your target market , and any market analysis or research you’ll need to conduct. In addition to defining your position among your competitors, you will establish your goals and milestones.
You can see what should be included in a sample financial plan, but It is wrong to assume that a sample company’s financial projections will fit your own. If you need more resources to get you started, we recommend this guide on how to write a business plan .
In addition, you can download our 40+ free business plan templates covering a range of industries.
Types of Business Plan
One-page business plans are short, compact, and to the point and are designed to make the plan easy to read at a glance. Make sure to include all of the sections, but truncate and summarize them:
One-Page Business Plans Outline
- Executive summary
- One-time Expense Summary
- Market analysis: in-depth
- Product & Service
- Description
- Competitor Analysis
- SWOT Analysis
- Financial Projections
Start-up business plans are for businesses that are just getting started. They are usually developed to secure outside funding. In this regard, financials are of increased importance, as well as other sections that determine whether your business idea is viable, such as market research.
Startup Business Plans Outline
- Product & Service Description
A strategic business plan lays out a company’s goals and how it will achieve them at a high level. It is a foundational document for the company as a whole. A strategic business plan allows all levels of the business to see the big picture, inspiring employees to work together to reach the company’s goals.
Strategic Business Plans Outline
- Company description
- Market analysis
- Products and services: for launch and expansion
- Marketing plan
- Logistics and operations plan
- Financials Projection
Developing a feasibility plan answers two primary questions about a business venture: who would purchase the service or product the company wants to sell, and if the venture is profitable.
Feasibility Business Plans Outline
- Products and services
Internal Business plans are geared to a specific audience within a company to keep your team on the same page and focused on the same goals.
Internal Business Plans Outline
In conclusion, whether you’re venturing into a traditional business or creating an innovative startup, the significance of a well-crafted business plan cannot be overstated.Different types of business plans cater to specific needs, from internal alignment to strategic expansion. Employing a template in MS Word ensures a polished presentation.The process of writing an executive summary, creating a plan, and defining the components of your business plan is essential.
Recognizing the need for a comprehensive and standard business plan can help guide your endeavors. Whether you choose to write a full business plan or opt for a one-page business overview, leveraging templates in MS Word can simplify the process. In essence, understanding the types of business plans and utilizing an executive summary template provides a structured approach to showcase your business overview.
Take inspiration from example business plans to tailor your strategy, ensuring a roadmap for success in the dynamic world of entrepreneurship. Always remember, a meticulously crafted business plan not only communicates your vision effectively but also serves as a valuable resource that can help secure investments and guide your business’s growth trajectory.
Begin with an executive summary, delve into market analysis, outline your strategies, create financial projections, and use available business plan examples as templates to guide your writing.
A comprehensive business plan template should encompass key sections such as an executive summary, business description, market analysis, marketing strategy, organizational structure, and financial projections. Seek templates online that cover these elements.
Tailor your business plan to the scale of your small business. Define your objectives clearly, outline cost-effective strategies, and emphasize agility in adapting to market changes.
Explore well-crafted business plan examples you can visit our website wisebusinessplan.
The fundamental components include an executive summary, business description, market analysis, marketing and sales strategy, organizational structure, product/service description, and financial projections.
Investors focus on growth potential, detailed financial projections, market analysis, competition analysis, and the qualifications and experience of your management team when reviewing a business plan.
To find a business plan example for a tech startup,you can visit our visit wisebusinessplan .
A business plan provides a comprehensive overview of your entire business, including strategies, operations, and financials. In contrast, a business proposal typically focuses on a specific project or offer, outlining the details and benefits to a potential client.
Craft an engaging executive summary by summarizing your business’s mission, highlighting the market opportunity, showcasing your product or service, and providing a concise overview of your financial projections.
Seek tailored business plan examples for nonprofit organizations you can visit wisebusinessplan .
Download Pack of 14 Business Plan Example
These business plans are written by MBA writers. Real-world use cases were used in these plans.
Get our business plan writing and consultation service.
Quick Links

- Investor Business Plans
- M&A Business Plan
- Private Placement
- Feasibility Study
- Hire a Business Plan Writer
- Business Valuation Calculator
- Business Plan Examples
- Real Estate Business Plan
- Business Plan Template
- Business Plan Pricing Guide
- Business Plan Makeover
- SBA Loans, Bank Funding & Business Credit
- Finding & Qualifying for Business Grants
- Leadership for the New Manager
- Content Marketing for Beginners
- All About Crowdfunding
- A Comprehensive Guide to Venture Capitalists
- EB-5 Regional Centers, A Step-By-Step Guide
- Logo Designer
- Landing Page
- PPC Advertising

- Business Entity
- Business Licensing
- Virtual Assistant
- Business Phone
- Business Address
- E-1 Visa Business Plan
- EB1-A Visa Business Plan
- EB1-C Visa Business Plan
- EB2-NIW Business Plan
- H1B Visa Business Plan
- O1 Visa Business Plan
- Business Brokers
- Merger & Acquisition Advisors
- Franchisors
Proud Sponsor of
- 1-800-496-1056

- (613) 800-0227

- +44 (1549) 409190

- +61 (2) 72510077

Download 14 Professional Business Plan Samples
Your Full Name
Simple Business Plan Template (2023)

Reviewed By
Updated: Nov 30, 2023, 4:49pm

Table of Contents
Why business plans are vital, get your free simple business plan template, how to write an effective business plan in 6 steps, frequently asked questions.
While taking many forms and serving many purposes, they all have one thing in common: business plans help you establish your goals and define the means for achieving them. Our simple business plan template covers everything you need to consider when launching a side gig, solo operation or small business. By following this step-by-step process, you might even uncover a few alternate routes to success.
Featured Partners
$0 + State Fees
Varies By State & Package

On LegalZoom's Website
ZenBusiness

On ZenBusiness' Website

On Incfile's Website
Whether you’re a first-time solopreneur or a seasoned business owner, the planning process challenges you to examine the costs and tasks involved in bringing a product or service to market. The process can also help you spot new income opportunities and hone in on the most profitable business models.
Though vital, business planning doesn’t have to be a chore. Business plans for lean startups and solopreneurs can simply outline the business concept, sales proposition, target customers and sketch out a plan of action to bring the product or service to market. However, if you’re seeking startup funding or partnership opportunities, you’ll need a write a business plan that details market research, operating costs and revenue forecasting.
Whichever startup category you fall into, if you’re at square one, our simple business plan template will point you down the right path.
Copy our free simple business plan template so you can fill in the blanks as we explore each element of your business plan. Need help getting your ideas flowing? You’ll also find several startup scenario examples below.
Download free template as .docx
Whether you need a quick-launch overview or an in-depth plan for investors, any business plan should cover the six key elements outlined in our free template and explained below. The main difference in starting a small business versus an investor-funded business is the market research and operational and financial details needed to support the concept.
1. Your Mission or Vision
Start by declaring a “dream statement” for your business. You can call this your executive summary, vision statement or mission. Whatever the name, the first part of your business plan summarizes your idea by answering five questions. Keep it brief, such as an elevator pitch. You’ll expand these answers in the following sections of the simple business plan template.
- What does your business do? Are you selling products, services, information or a combination?
- Where does this happen? Will you conduct business online, in-store, via mobile means or in a specific location or environment?
- Who does your business benefit? Who is your target market and ideal customer for your concept?
- Why would potential customers care? What would make your ideal customers take notice of your business?
- How do your products and/or services outshine the competition? What would make your ideal customers choose you over a competitor?
These answers come easily if you have a solid concept for your business, but don’t worry if you get stuck. Use the rest of your plan template to brainstorm ideas and tactics. You’ll quickly find these answers and possibly new directions as you explore your ideas and options.
2. Offer and Value Proposition
This is where you detail your offer, such as selling products, providing services or both, and why anyone would care. That’s the value proposition. Specifically, you’ll expand on your answers to the first and fourth bullets from your mission/vision.
As you complete this section, you might find that exploring value propositions uncovers marketable business opportunities that you hadn’t yet considered. So spend some time brainstorming the possibilities in this section.
For example, a cottage baker startup specializing in gluten-free or keto-friendly products might be a value proposition that certain audiences care deeply about. Plus, you could expand on that value proposition by offering wedding and other special-occasion cakes that incorporate gluten-free, keto-friendly and traditional cake elements that all guests can enjoy.

3. Audience and Ideal Customer
Here is where you explore bullet point number three, who your business will benefit. Identifying your ideal customer and exploring a broader audience for your goods or services is essential in defining your sales and marketing strategies, plus it helps fine-tune what you offer.
There are many ways to research potential audiences, but a shortcut is to simply identify a problem that people have that your product or service can solve. If you start from the position of being a problem solver, it’s easy to define your audience and describe the wants and needs of your ideal customer for marketing efforts.
Using the cottage baker startup example, a problem people might have is finding fresh-baked gluten-free or keto-friendly sweets. Examining the wants and needs of these people might reveal a target audience that is health-conscious or possibly dealing with health issues and willing to spend more for hard-to-find items.
However, it’s essential to have a customer base that can support your business. You can be too specialized. For example, our baker startup can attract a broader audience and boost revenue by offering a wider selection of traditional baked goods alongside its gluten-free and keto-focused specialties.
4. Revenue Streams, Sales Channels and Marketing
Thanks to our internet-driven economy, startups have many revenue opportunities and can connect with target audiences through various channels. Revenue streams and sales channels also serve as marketing vehicles, so you can cover all three in this section.
Revenue Streams
Revenue streams are the many ways you can make money in your business. In your plan template, list how you’ll make money upon launch, plus include ideas for future expansion. The income possibilities just might surprise you.
For example, our cottage baker startup might consider these revenue streams:
- Product sales : Online, pop-up shops , wholesale and (future) in-store sales
- Affiliate income : Monetize blog and social media posts with affiliate links
- Advertising income : Reserve website space for advertising
- E-book sales : (future) Publish recipe e-books targeting gluten-free and keto-friendly dessert niches
- Video income : (future) Monetize a YouTube channel featuring how-to videos for the gluten-free and keto-friendly dessert niches
- Webinars and online classes : (future) Monetize coaching-style webinars and online classes covering specialty baking tips and techniques
- Members-only content : (future) Monetize a members-only section of the website for specialty content to complement webinars and online classes
- Franchise : (future) Monetize a specialty cottage bakery concept and sell to franchise entrepreneurs
Sales Channels
Sales channels put your revenue streams into action. This section also answers the “where will this happen” question in the second bullet of your vision.
The product sales channels for our cottage bakery example can include:
- Mobile point-of-sale (POS) : A mobile platform such as Shopify or Square POS for managing in-person sales at local farmers’ markets, fairs and festivals
- E-commerce platform : An online store such as Shopify, Square or WooCommerce for online retail sales and wholesale sales orders
- Social media channels : Facebook, Instagram and Pinterest shoppable posts and pins for online sales via social media channels
- Brick-and-mortar location : For in-store sales , once the business has grown to a point that it can support a physical location
Channels that support other income streams might include:
- Affiliate income : Blog section on the e-commerce website and affiliate partner accounts
- Advertising income : Reserved advertising spaces on the e-commerce website
- E-book sales : Amazon e-book sales via Amazon Kindle Direct Publishing
- Video income : YouTube channel with ad monetization
- Webinars and online classes : Online class and webinar platforms that support member accounts, recordings and playback
- Members-only content : Password-protected website content using membership apps such as MemberPress
Nowadays, the line between marketing and sales channels is blurred. Social media outlets, e-books, websites, blogs and videos serve as both marketing tools and income opportunities. Since most are free and those with advertising options are extremely economical, these are ideal marketing outlets for lean startups.
However, many businesses still find value in traditional advertising such as local radio, television, direct mail, newspapers and magazines. You can include these advertising costs in your simple business plan template to help build a marketing plan and budget.

5. Structure, Suppliers and Operations
This section of your simple business plan template explores how to structure and operate your business. Details include the type of business organization your startup will take, roles and responsibilities, supplier logistics and day-to-day operations. Also, include any certifications or permits needed to launch your enterprise in this section.
Our cottage baker example might use a structure and startup plan such as this:
- Business structure : Sole proprietorship with a “doing business as” (DBA) .
- Permits and certifications : County-issued food handling permit and state cottage food certification for home-based food production. Option, check into certified commercial kitchen rentals.
- Roles and responsibilities : Solopreneur, all roles and responsibilities with the owner.
- Supply chain : Bulk ingredients and food packaging via Sam’s Club, Costco, Amazon Prime with annual membership costs. Uline for shipping supplies; no membership needed.
- Day-to-day operations : Source ingredients and bake three days per week to fulfill local and online orders. Reserve time for specialty sales, wholesale partner orders and market events as needed. Ship online orders on alternating days. Update website and create marketing and affiliate blog posts on non-shipping days.
Start A Limited Liability Company Online Today with ZenBusiness
Click to get started.
6. Financial Forecasts
Your final task is to list forecasted business startup and ongoing costs and profit projections in your simple business plan template. Thanks to free business tools such as Square and free marketing on social media, lean startups can launch with few upfront costs. In many cases, cost of goods, shipping and packaging, business permits and printing for business cards are your only out-of-pocket expenses.
Cost Forecast
Our cottage baker’s forecasted lean startup costs might include:
Gross Profit Projections
This helps you determine the retail prices and sales volume required to keep your business running and, hopefully, earn income for yourself. Use product research to spot target retail prices for your goods, then subtract your cost of goods, such as hourly rate, raw goods and supplier costs. The total amount is your gross profit per item or service.
Here are some examples of projected gross profits for our cottage baker:
Bottom Line
Putting careful thought and detail in a business plan is always beneficial, but don’t get so bogged down in planning that you never hit the start button to launch your business . Also, remember that business plans aren’t set in stone. Markets, audiences and technologies change, and so will your goals and means of achieving them. Think of your business plan as a living document and regularly revisit, expand and restructure it as market opportunities and business growth demand.
Is there a template for a business plan?
You can copy our free business plan template and fill in the blanks or customize it in Google Docs, Microsoft Word or another word processing app. This free business plan template includes the six key elements that any entrepreneur needs to consider when launching a new business.
What does a simple business plan include?
A simple business plan is a one- to two-page overview covering six key elements that any budding entrepreneur needs to consider when launching a startup. These include your vision or mission, product or service offering, target audience, revenue streams and sales channels, structure and operations, and financial forecasts.
How can I create a free business plan template?
Start with this free simple business plan template that covers the six essential elements of a startup. Once downloaded, you can edit this document in Google Docs or another word processing app and add new sections or subsections to your plan template to meet your specific business plan needs.
What basic items should be included in a business plan?
When writing out a business plan, you want to make sure that you cover everything related to your concept for the business, an analysis of the industry―including potential customers and an overview of the market for your goods or services―how you plan to execute your vision for the business, how you plan to grow the business if it becomes successful and all financial data around the business, including current cash on hand, potential investors and budget plans for the next few years.
- Best LLC Services
- Best Registered Agent Services
- Best Trademark Registration Services
- Top LegalZoom Competitors
- Best Business Loans
- Best Business Plan Software
- ZenBusiness Review
- LegalZoom LLC Review
- Northwest Registered Agent Review
- Rocket Lawyer Review
- Inc. Authority Review
- Rocket Lawyer vs LegalZoom
- Incfile Review
- Swyft Filings Review
- Harbor Compliance Review
- Sole Proprietorship vs LLC
- LLC vs Corporation
- LLC vs S Corp
- LegalZoom vs Incfile
- LegalZoom vs ZenBusiness
- LegalZoom vs Rocket Lawyer
- ZenBusiness vs Incfile
- How To Start A Business
- How to Set Up an LLC
- How to Get a Business License
- LLC Operating Agreement Template
- 501(c)(3) Application Guide
- What is a Business License?
- What is an LLC?
- What is an S Corp?
- What is a C Corp?
- What is a DBA?
- What is a Sole Proprietorship?
- What is a Registered Agent?
- How to Dissolve an LLC
- How to File a DBA
- What Are Articles Of Incorporation?
- Types Of Business Ownership

Next Up In Company Formation
- Best Online Legal Services
- How To Write A Business Plan
- Member-Managed LLC Vs. Manager-Managed LLC
- Starting An S-Corp
- LLC Vs. C-Corp
- How Much Does It Cost To Start An LLC?

How To Calculate & Improve Your Customer Retention Rate

How To Watch Fargo Season Five

Best North Carolina Registered Agent Services Of 2023

Workplace Benefit Trends By Generation In 2023

How To Send An Anonymous Email (5 Simple Methods)

7 Best Colorado Registered Agent Services Of 2023
Krista Fabregas is a seasoned eCommerce and online content pro sharing more than 20 years of hands-on know-how with those looking to launch and grow tech-forward businesses. Her expertise includes eCommerce startups and growth, SMB operations and logistics, website platforms, payment systems, side-gig and affiliate income, and multichannel marketing. Krista holds a bachelor's degree in English from The University of Texas at Austin and held senior positions at NASA, a Fortune 100 company, and several online startups.
24 Best Sample Business Plans & Examples to Help You Write Your Own

Published: August 17, 2023
Free Business Plan Template
.png)
The essential document for starting a business -- custom built for your needs.
Thank you for downloading the offer.
Reading sample business plans is essential when you’re writing your own. As you explore business plan examples from real companies and brands, you’ll learn how to write one that gets your business off on the right foot, convinces investors to provide funding, and confirms your venture is sustainable for the long term.

hbspt.cta._relativeUrls=true;hbspt.cta.load(53, 'e9d2eacb-6b01-423a-bf7a-19d42ba77eaa', {"useNewLoader":"true","region":"na1"});
But what does a business plan look like? And how do you write one that is viable and convincing? Let's review the ideal business plan formally, then take a look at business plan templates and samples you can use to inspire your own.
Business Plan Format
Ask any successful sports coach how they win so many games, and they’ll tell you they have a unique plan for every single game. The same logic applies to business. If you want to build a thriving company that can pull ahead of the competition, you need to prepare for battle before breaking into a market.
Business plans guide you along the rocky journey of growing a company. Referencing one will keep you on the path toward success. And if your business plan is compelling enough, it can also convince investors to give you funding.
With so much at stake, you might be wondering, "Where do I start? How should I format this?"
Typically, a business plan is a document that will detail how a company will achieve its goals.
.webp)
- Outline your idea.
- Pitch to investors.
- Secure funding.
- Get to work!
You're all set!
Click this link to access this resource at any time.
Fill out the form to get your free template.
Most business plans include the following sections:
1. Executive Summary
The executive summary is arguably the most important section of the entire business plan. Essentially, it's the overview or introduction, written in a way to grab readers' attention and guide them through the rest of the business plan. This is important, because a business plan can be dozens or hundreds of pages long.
Most executive summaries include:
- Mission statement
- Company history and leadership
- Competitive advantage overview
- Financial projections
- Company goals
Keep in mind you'll cover many of these topics in more detail later on in the business plan. So, keep the executive summary clear and brief, including only the most important takeaways.
Executive Summary Business Plan Examples
This example was created with HubSpot’s business plan template:

And the executive summary below tells potential investors a short story that covers all the most important details this business plan will cover in a succinct and interesting way.
.webp?width=500&height=418&name=executive-summary-business-plans-examples%20(1).webp)
Image Source
Tips for Writing Your Executive Summary
- Clearly define a problem, and explain how your product solves that problem, and show why the market needs your business.
- Be sure to highlight your value proposition, market opportunity, and growth potential.
- Keep it concise and support ideas with data.
- Customize your summary to your audience. For example, emphasize finances and return on investment for venture capitalists.
Check out our tips for writing an effective executive summary for more guidance.
2. Market Opportunity
This is where you'll detail the opportunity in the market. Where is the gap in the current industry, and how will your product fill that gap?
In this section, you might include:
- The size of the market
- Current or potential market share
- Trends in the industry and consumer behavior
- Where the gap is
- What caused the gap
- How you intend to fill it
To get a thorough understanding of the market opportunity, you'll want to conduct a TAM, SAM, and SOM analysis and perform market research on your industry. You may also benefit from creating a SWOT analysis to get some of the insights for this section.
Market Opportunity Business Plan Example
This example uses critical data to underline the size of the potential market and what part of that market this service hopes to capture.

Tips for Writing Your Market Opportunity Section
- Focus on demand and potential for growth.
- Use market research, surveys, and industry trend data to support your market forecast and projections.
- Add a review of regulation shifts, tech advances, and consumer behavior changes.
- Refer to reliable sources.
- Showcase how your business can make the most of this opportunity.
3. Competitive Landscape
Speaking of market share, you'll need to create a section that shares details on who the top competitors are. After all, your customers likely have more than one brand to choose from, and you'll want to understand exactly why they might choose one over another. Performing a competitive analysis can help you uncover:
- Industry trends that other brands may not be utilizing
- Strengths in your competition that may be obstacles to handle
- Weaknesses in your competition that may help you develop selling points
- The unique proposition you bring to the market that may resonate with customers
Competitive Landscape Business Plan Example
The competitive landscape section of the business plan below shows a clear outline of who the top competitors are. It also highlights specific industry knowledge and the importance of location, which shows useful experience in this specific industry. This can help build trust in your ability to execute your business plan.
.webp?width=500&height=405&name=competitive-landscape-business-plans-examples%20(1).webp)
Tips for Writing Your Competitive Landscape
- Complete in-depth research, then emphasize your most important findings.
- Compare your unique selling proposition (USP) to your direct and indirect competitors.
- Show a clear and realistic plan for product and brand differentiation.
- Look for specific advantages and barriers in the competitive landscape. Then, highlight how that information could impact your business.
- Outline growth opportunities from a competitive perspective.
- Add customer feedback and insights to support your competitive analysis.
4. Target Audience
This section will describe who your customer segments are in detail. What is the demographic and psychographic information of your audience?
If your immediate answer is "everyone," you'll need to dig deeper. Ask yourself:
- What demographics will most likely need/buy your product or service?
- What are the psychographics of this audience? (Desires, triggering events, etc.)
- Why are your offerings valuable to them?
It can be helpful to build a buyer persona to get in the mindset of your ideal customers and be clear on why you're targeting them.
Target Audience Business Plan Example
The example below uses in-depth research to draw conclusions about audience priorities. It also analyzes how to create the right content for this audience.

Tips for Writing Your Target Audience Section
- Include details on the size and growth potential of your target audience.
- Figure out and refine the pain points for your target audience , then show why your product is a useful solution.
- Describe your targeted customer acquisition strategy in detail.
- Share anticipated challenges your business may face in acquiring customers and how you plan to address them.
- Add case studies, testimonials, and other data to support your target audience ideas.
- Remember to consider niche audiences and segments of your target audience in your business plan.
5. Marketing Strategy
Here, you'll discuss how you'll acquire new customers with your marketing strategy. You might consider including information on:
- The brand positioning vision and how you'll cultivate it
- The goal targets you aim to achieve
- The metrics you'll use to measure success
- The channels and distribution tactics you'll use
It can help to already have a marketing plan built out to help you with this part of your business plan.
Marketing Strategy Business Plan Example
This business plan example includes the marketing strategy for the town of Gawler. It offers a comprehensive picture of how it plans to use digital marketing to promote the community.

Tips for Writing Your Marketing Strategy
- Include a section about how you believe your brand vision will appeal to customers.
- Add the budget and resources you'll need to put your plan in place.
- Outline strategies for specific marketing segments.
- Connect strategies to earlier sections like target audience and competitive analysis.
- Review how your marketing strategy will scale with the growth of your business.
- Cover a range of channels and tactics to highlight your ability to adapt your plan in the face of change.
6. Key Features and Benefits
At some point in your business plan, you'll review the key features and benefits of your products and/or services. Laying these out can give readers an idea of how you're positioning yourself in the market and the messaging you're likely to use . It can even help them gain better insight into your business model.
Key Features and Benefits Business Plan Example
The example below outlines products and services for this business, along with why these qualities will attract the audience.

Tips for Writing Your Key Features and Benefits
- Emphasize why and how your product or service offers value to customers.
- Use metrics and testimonials to support the ideas in this section.
- Talk about how your products and services have the potential to scale.
- Think about including a product roadmap.
- Focus on customer needs, and how the features and benefits you are sharing meet those needs.
- Offer proof of concept for your ideas, like case studies or pilot program feedback.
- Proofread this section carefully, and remove any jargon or complex language.
7. Pricing and Revenue
This is where you'll discuss your cost structure and various revenue streams. Your pricing strategy must be solid enough to turn a profit while staying competitive in the industry. For this reason, you might outline:
- The specific pricing breakdowns per product or service
- Why your pricing is higher or lower than your competition's
- (If higher) Why customers would be willing to pay more
- (If lower) How you're able to offer your products or services at a lower cost
- When you expect to break even, what margins do you expect, etc?
Pricing and Revenue Business Plan Example
This business plan example begins with an overview of the business revenue model, then shows proposed pricing for key products.

Tips for Writing Your Pricing and Revenue Section
- Get specific about your pricing strategy. Specifically, how you connect that strategy to customer needs and product value.
- If you are asking a premium price, share unique features or innovations that justify that price point.
- Show how you plan to communicate pricing to customers.
- Create an overview of every revenue stream for your business and how each stream adds to your business model as a whole.
- Share plans to develop new revenue streams in the future.
- Show how and whether pricing will vary by customer segment and how pricing aligns with marketing strategies.
- Restate your value proposition and explain how it aligns with your revenue model.
8. Financials
This section is particularly informative for investors and leadership teams to figure out funding strategies, investment opportunities, and more. According to Forbes , you'll want to include three main things:
- Profit/Loss Statement - This answers the question of whether your business is currently profitable.
- Cash Flow Statement - This details exactly how much cash is incoming and outgoing to give insight into how much cash a business has on hand.
- Balance Sheet - This outlines assets, liabilities, and equity, which gives insight into how much a business is worth.
While some business plans might include more or less information, these are the key details you'll want to include.
Financials Business Plan Example
This balance sheet example shows the level of detail you will need to include in the financials section of your business plan:

Tips for Writing Your Financials Section
- Growth potential is important in this section too. Using your data, create a forecast of financial performance in the next three to five years.
- Include any data that supports your projections to assure investors of the credibility of your proposal.
- Add a break-even analysis to show that your business plan is financially practical. This information can also help you pivot quickly as your business grows.
- Consider adding a section that reviews potential risks and how sensitive your plan is to changes in the market.
- Triple-check all financial information in your plan for accuracy.
- Show how any proposed funding needs align with your plans for growth.
As you create your business plan, keep in mind that each of these sections will be formatted differently. Some may be in paragraph format, while others could be charts or graphs.
Business Plan Types
The formats above apply to most types of business plans. That said, the format and structure of your plan will vary by your goals for that plan. So, we’ve added a quick review of different business plan types. For a more detailed overview, check out this post .
1. Startups
Startup business plans are for proposing new business ideas.
If you’re planning to start a small business, preparing a business plan is crucial. The plan should include all the major factors of your business. You can check out this guide for more detailed business plan inspiration .
2. Feasibility Studies
Feasibility business plans focus on that business's product or service. Feasibility plans are sometimes added to startup business plans. They can also be a new business plan for an already thriving organization.
3. Internal Use
You can use internal business plans to share goals, strategies, or performance updates with stakeholders. Internal business plans are useful for alignment and building support for ambitious goals.
4. Strategic Initiatives
Another business plan that's often for sharing internally is a strategic business plan. This plan covers long-term business objectives that might not have been included in the startup business plan.
5. Business Acquisition or Repositioning
When a business is moving forward with an acquisition or repositioning, it may need extra structure and support. These types of business plans expand on a company's acquisition or repositioning strategy.
Growth sometimes just happens as a business continues operations. But more often, a business needs to create a structure with specific targets to meet set goals for expansion. This business plan type can help a business focus on short-term growth goals and align resources with those goals.
Sample Business Plan Templates
Now that you know what's included and how to format a business plan, let's review some templates.
1. HubSpot's One-Page Business Plan
Download a free, editable one-page business plan template..
The business plan linked above was created here at HubSpot and is perfect for businesses of any size — no matter how many strategies we still have to develop.
Fields such as Company Description, Required Funding, and Implementation Timeline give this one-page business plan a framework for how to build your brand and what tasks to keep track of as you grow. Then, as the business matures, you can expand on your original business plan with a new iteration of the above document.
Why We Like It
This one-page business plan is a fantastic choice for the new business owner who doesn’t have the time or resources to draft a full-blown business plan. It includes all the essential sections in an accessible, bullet-point-friendly format. That way, you can get the broad strokes down before honing in on the details.
2. HubSpot's Downloadable Business Plan Template

We also created a business plan template for entrepreneurs.
The template is designed as a guide and checklist for starting your own business. You’ll learn what to include in each section of your business plan and how to do it. There’s also a list for you to check off when you finish each section of your business plan.
Strong game plans help coaches win games and help businesses rocket to the top of their industries. So if you dedicate the time and effort required to write a workable and convincing business plan, you’ll boost your chances of success and even dominance in your market.
This business plan kit is essential for the budding entrepreneur who needs a more extensive document to share with investors and other stakeholders. It not only includes sections for your executive summary, product line, market analysis, marketing plan, and sales plan, but it also offers hands-on guidance for filling out those sections.
3. LiveFlow’s Financial Planning Template with built-in automation

This free template from LiveFlow aims to make it easy for businesses to create a financial plan and track their progress on a monthly basis. The P&L Budget versus Actual format allows users to track their revenue, cost of sales, operating expenses, operating profit margin, net profit, and more.
The summary dashboard aggregates all of the data put into the financial plan sheet and will automatically update when changes are made. Instead of wasting hours manually importing your data to your spreadsheet, LiveFlow can also help you to automatically connect your accounting and banking data directly to your spreadsheet, so your numbers are always up-to-date.
With the dashboard, you can view your runway, cash balance, burn rate, gross margins, and other metrics. Having a simple way to track everything in one place will make it easier to complete the financials section of your business plan.
This is a fantastic template to track performance and alignment internally and to create a dependable process for documenting financial information across the business. It’s highly versatile and beginner-friendly. It’s especially useful if you don’t have an accountant on the team. (We always recommend you do, but for new businesses, having one might not be possible.)
4. ThoughtCo’s Sample Business Plan

One of the more financially oriented sample business plans in this list, BPlan’s free business plan template dedicates many of its pages to your business’s financial plan and financial statements.
After filling this business plan out, your company will truly understand its financial health and the steps you need to take to maintain or improve it.
We absolutely love this business plan template because of its ease-of-use and hands-on instructions (in addition to its finance-centric components). If you feel overwhelmed by the thought of writing an entire business plan, consider using this template to help you with the process.
6. Harvard Business Review’s "How to Write a Winning Business Plan"
Most sample business plans teach you what to include in your business plan, but this Harvard Business Review article will take your business plan to the next level — it teaches you the why and how behind writing a business plan.
With the guidance of Stanley Rich and Richard Gumpert, co-authors of " Business Plans That Win: Lessons From the MIT Enterprise Forum ", you'll learn how to write a convincing business plan that emphasizes the market demand for your product or service. You’ll also learn the financial benefits investors can reap from putting money into your venture rather than trying to sell them on how great your product or service is.
This business plan guide focuses less on the individual parts of a business plan, and more on the overarching goal of writing one. For that reason, it’s one of our favorites to supplement any template you choose to use. Harvard Business Review’s guide is instrumental for both new and seasoned business owners.
7. HubSpot’s Complete Guide to Starting a Business
If you’re an entrepreneur, you know writing a business plan is one of the most challenging first steps to starting a business. Fortunately, with HubSpot's comprehensive guide to starting a business, you'll learn how to map out all the details by understanding what to include in your business plan and why it’s important to include them. The guide also fleshes out an entire sample business plan for you.
If you need further guidance on starting a business, HubSpot's guide can teach you how to make your business legal, choose and register your business name, and fund your business. It will also give small business tax information and includes marketing, sales, and service tips.
This comprehensive guide will walk you through the process of starting a business, in addition to writing your business plan, with a high level of exactitude and detail. So if you’re in the midst of starting your business, this is an excellent guide for you. It also offers other resources you might need, such as market analysis templates.
8. Panda Doc’s Free Business Plan Template

PandaDoc’s free business plan template is one of the more detailed and fleshed-out sample business plans on this list. It describes what you should include in each section, so you don't have to come up with everything from scratch.
Once you fill it out, you’ll fully understand your business’ nitty-gritty details and how all of its moving parts should work together to contribute to its success.
This template has two things we love: comprehensiveness and in-depth instructions. Plus, it’s synced with PandaDoc’s e-signature software so that you and other stakeholders can sign it with ease. For that reason, we especially love it for those starting a business with a partner or with a board of directors.
9. Small Business Administration Free Business Plan Template

The Small Business Administration (SBA) offers several free business plan templates that can be used to inspire your own plan. Before you get started, you can decide what type of business plan you need — a traditional or lean start-up plan.
Then, you can review the format for both of those plans and view examples of what they might look like.
We love both of the SBA’s templates because of their versatility. You can choose between two options and use the existing content in the templates to flesh out your own plan. Plus, if needed, you can get a free business counselor to help you along the way.
Top Business Plan Examples
Here are some completed business plan samples to get an idea of how to customize a plan for your business. We’ve chosen different types of business plan ideas to expand your imagination. Some are extensive, while others are fairly simple.
Take a look.
1. LiveFlow

One of the major business expenses is marketing. How you handle your marketing reflects your company’s revenue. We included this business plan to show you how you can ensure your marketing team is aligned with your overall business plan to get results. The plan also shows you how to track even the smallest metrics of your campaigns, like ROI and payback periods instead of just focusing on big metrics like gross and revenue.
Fintech startup, LiveFlow, allows users to sync real-time data from its accounting services, payment platforms, and banks into custom reports. This eliminates the task of pulling reports together manually, saving teams time and helping automate workflows.
When it came to including marketing strategy in its business plan, LiveFlow created a separate marketing profit and loss statement (P&L) to track how well the company was doing with its marketing initiatives. This is a great approach, allowing businesses to focus on where their marketing dollars are making the most impact.
"Using this framework over a traditional marketing plan will help you set a profitable marketing strategy taking things like CAC, LTV, Payback period, and P&L into consideration," explains LiveFlow co-founder, Lasse Kalkar .
Having this information handy will enable you to build out your business plan’s marketing section with confidence. LiveFlow has shared the template here . You can test it for yourself.
2. Lula Body

Sometimes all you need is a solid mission statement and core values to guide you on how to go about everything. You do this by creating a business plan revolving around how to fulfill your statement best. For example, Patagonia is an eco-friendly company, so their plan discusses how to make the best environmentally friendly products without causing harm.
A good mission statement should not only resonate with consumers but should also serve as a core value compass for employees as well.
Outdoor clothing retailer, Patagonia, has one of the most compelling mission statements we’ve seen:
"Together, let’s prioritise purpose over profit and protect this wondrous planet, our only home."
It reels you in from the start, and the environmentally friendly theme continues throughout the rest of the statement.
This mission goes on to explain that they are out to "Build the best product, cause no unnecessary harm, and use business to protect nature."
Their mission statement is compelling and detailed, with each section outlining how they will accomplish their goal.
4. Vesta Home Automation

This is the kind of business plan you need when applying for business funds. It clearly illustrates the expected future of the company and how the business has been coming along over the years.
This executive summary for a smart home device startup is part of a business plan created by students at Mount Royal University . While it lacks some of the sleek visuals of the templates above, its executive summary does a great job of demonstrating how invested they are in the business.
Right away, they mention they’ve invested $200,000 into the company already, which shows investors they have skin in the game and aren’t just looking for someone else to foot the bill.
5. NALB Creative Center

This fictional business plan for an art supply store includes everything one might need in a business plan: an executive summary, a company summary, a list of services, a market analysis summary, and more. Due to its comprehensiveness, it’s an excellent example to follow if you’re opening a brick-and-mortar store and need to get external funding to start your business .
One of its most notable sections is its market analysis summary, which includes an overview of the population growth in the business’ target geographical area, as well as a breakdown of the types of potential customers they expect to welcome at the store. This sort of granular insight is essential for understanding and communicating your business’s growth potential. Plus, it lays a strong foundation for creating relevant and useful buyer personas .
It’s essential to keep this information up-to-date as your market and target buyer changes. For that reason, you should carry out market research as often as possible to ensure that you’re targeting the correct audience and sharing accurate information with your investors.
6. Curriculum Companion Suites (CSS)

If you’re looking for a SaaS business plan example, look no further than this business plan for a fictional educational software company called Curriculum Companion Suites. Like the business plan for the NALB Creative Center, it includes plenty of information for prospective investors and other key stakeholders in the business.
One of the most notable features of this business plan is the executive summary, which includes an overview of the product, market, and mission. The first two are essential for software companies because the product offering is so often at the forefront of the company’s strategy. Without that information being immediately available to investors and executives, then you risk writing an unfocused business plan.
It’s also essential to front-load your company’s mission if it explains your "Why?" In other words, why do you do what you do, and why should stakeholders care? This is an important section to include if you feel that your mission will drive interest in the business and its offerings.
7. Culina Sample Business Plan

Culina's sample business plan is an excellent example of how to lay out your business plan so that it flows naturally, engages readers, and provides the critical information investors and stakeholders need. You can also use this template as a guide while you're gathering important details. After looking at this sample, you'll have a better understanding of the data and research you need to do for your own business plan.
8. Plum Sample Business Plan

Don't forget to share this post!
Related articles.
![sample business plan format pdf How to Write a Powerful Executive Summary [+4 Top Examples]](https://blog.hubspot.com/hubfs/executive-summary-example_5.webp)
How to Write a Powerful Executive Summary [+4 Top Examples]

19 Best Sample Business Plans & Examples to Help You Write Your Own

What is a Business Plan? Definition, Tips, and Templates

Maximizing Your Social Media Strategy: The Top Aggregator Tools to Use

The Content Aggregator Guide for 2023
![sample business plan format pdf 7 Gantt Chart Examples You'll Want to Copy [+ 5 Steps to Make One]](https://blog.hubspot.com/hubfs/gantt-chart-example.jpg)
7 Gantt Chart Examples You'll Want to Copy [+ 5 Steps to Make One]
![sample business plan format pdf The 8 Best Free Flowchart Templates [+ Examples]](https://blog.hubspot.com/hubfs/flowchart%20templates.jpg)
The 8 Best Free Flowchart Templates [+ Examples]

15 Best Screen Recorders to Use for Collaboration

The 25 Best Google Chrome Extensions for SEO

Professional Invoice Design: 28 Samples & Templates to Inspire You
2 Essential Templates For Starting Your Business
Small Business Trends
How to write a business plan step-by-step in 2024 (+ examples and free template).
This is the ultimate guide to creating a comprehensive and effective plan for your new venture. In today’s dynamic business landscape, having a well-crafted business plan is an important first step to securing funding, attracting partners, and navigating the challenges of entrepreneurship.
This guide has been designed to help you create a winning plan that stands out in the ever-evolving marketplace. U sing real-world examples and a free downloadable template, it will walk you through each step of the process.
Whether you’re a seasoned entrepreneur or launching your very first startup, the guide will give you the insights, tools, and confidence you need to create a solid foundation for your business.

Table of Contents
What is a Business Plan?
A business plan is a strategic document that outlines an organization’s goals, objectives, and the steps required to achieve them. It serves as a roadmap as you start a business , guiding the company’s direction and growth while identifying potential obstacles and opportunities.
Typically, a business plan covers areas such as market analysis, financial projections, marketing strategies, and organizational structure. It not only helps in securing funding from investors and lenders but also provides clarity and focus to the management team.
A well-crafted business plan is a very important part of your business startup checklist because it fosters informed decision-making and long-term success.

Small Business Deals
Why you should write a business plan.
Understanding the importance of a business plan in today’s competitive environment is crucial for entrepreneurs and business owners. Here are five compelling reasons to write a business plan in 2024:
- Attract Investors and Secure Funding : A well-written business plan demonstrates your venture’s potential and profitability, making it easier to attract investors and secure the necessary funding for growth and development. It provides a detailed overview of your business model, target market, financial projections, and growth strategies, instilling confidence in potential investors and lenders that your company is a worthy investment.
- Clarify Business Objectives and Strategies : Crafting a business plan forces you to think critically about your goals and the strategies you’ll employ to achieve them, providing a clear roadmap for success. This process helps you refine your vision and prioritize the most critical objectives, ensuring that your efforts are focused on achieving the desired results.
- Identify Potential Risks and Opportunities : Analyzing the market, competition, and industry trends within your business plan helps identify potential risks and uncover untapped opportunities for growth and expansion. This insight enables you to develop proactive strategies to mitigate risks and capitalize on opportunities, positioning your business for long-term success.
- Improve Decision-Making : A business plan serves as a reference point so you can make informed decisions that align with your company’s overall objectives and long-term vision. By consistently referring to your plan and adjusting it as needed, you can ensure that your business remains on track and adapts to changes in the market, industry, or internal operations.
- Foster Team Alignment and Communication : A shared business plan helps ensure that all team members are on the same page, promoting clear communication, collaboration, and a unified approach to achieving the company’s goals. By involving your team in the planning process and regularly reviewing the plan together, you can foster a sense of ownership, commitment, and accountability that drives success.
What are the Different Types of Business Plans?
In today’s fast-paced business world, having a well-structured roadmap is more important than ever. A traditional business plan provides a comprehensive overview of your company’s goals and strategies, helping you make informed decisions and achieve long-term success. There are various types of business plans, each designed to suit different needs and purposes. Let’s explore the main types:
- Startup Business Plan: Tailored for new ventures, a startup business plan outlines the company’s mission, objectives, target market, competition, marketing strategies, and financial projections. It helps entrepreneurs clarify their vision, secure funding from investors, and create a roadmap for their business’s future. Additionally, this plan identifies potential challenges and opportunities, which are crucial for making informed decisions and adapting to changing market conditions.
- Internal Business Plan: This type of plan is intended for internal use, focusing on strategies, milestones, deadlines, and resource allocation. It serves as a management tool for guiding the company’s growth, evaluating its progress, and ensuring that all departments are aligned with the overall vision. The internal business plan also helps identify areas of improvement, fosters collaboration among team members, and provides a reference point for measuring performance.
- Strategic Business Plan: A strategic business plan outlines long-term goals and the steps to achieve them, providing a clear roadmap for the company’s direction. It typically includes a SWOT analysis, market research, and competitive analysis. This plan allows businesses to align their resources with their objectives, anticipate changes in the market, and develop contingency plans. By focusing on the big picture, a strategic business plan fosters long-term success and stability.
- Feasibility Business Plan: This plan is designed to assess the viability of a business idea, examining factors such as market demand, competition, and financial projections. It is often used to decide whether or not to pursue a particular venture. By conducting a thorough feasibility analysis, entrepreneurs can avoid investing time and resources into an unviable business concept. This plan also helps refine the business idea, identify potential obstacles, and determine the necessary resources for success.
- Growth Business Plan: Also known as an expansion plan, a growth business plan focuses on strategies for scaling up an existing business. It includes market analysis, new product or service offerings, and financial projections to support expansion plans. This type of plan is essential for businesses looking to enter new markets, increase their customer base, or launch new products or services. By outlining clear growth strategies, the plan helps ensure that expansion efforts are well-coordinated and sustainable.
- Operational Business Plan: This type of plan outlines the company’s day-to-day operations, detailing the processes, procedures, and organizational structure. It is an essential tool for managing resources, streamlining workflows, and ensuring smooth operations. The operational business plan also helps identify inefficiencies, implement best practices, and establish a strong foundation for future growth. By providing a clear understanding of daily operations, this plan enables businesses to optimize their resources and enhance productivity.
- Lean Business Plan: A lean business plan is a simplified, agile version of a traditional plan, focusing on key elements such as value proposition, customer segments, revenue streams, and cost structure. It is perfect for startups looking for a flexible, adaptable planning approach. The lean business plan allows for rapid iteration and continuous improvement, enabling businesses to pivot and adapt to changing market conditions. This streamlined approach is particularly beneficial for businesses in fast-paced or uncertain industries.
- One-Page Business Plan: As the name suggests, a one-page business plan is a concise summary of your company’s key objectives, strategies, and milestones. It serves as a quick reference guide and is ideal for pitching to potential investors or partners. This plan helps keep teams focused on essential goals and priorities, fosters clear communication, and provides a snapshot of the company’s progress. While not as comprehensive as other plans, a one-page business plan is an effective tool for maintaining clarity and direction.
- Nonprofit Business Plan: Specifically designed for nonprofit organizations, this plan outlines the mission, goals, target audience, fundraising strategies, and budget allocation. It helps secure grants and donations while ensuring the organization stays on track with its objectives. The nonprofit business plan also helps attract volunteers, board members, and community support. By demonstrating the organization’s impact and plans for the future, this plan is essential for maintaining transparency, accountability, and long-term sustainability within the nonprofit sector.
- Franchise Business Plan: For entrepreneurs seeking to open a franchise, this type of plan focuses on the franchisor’s requirements, as well as the franchisee’s goals, strategies, and financial projections. It is crucial for securing a franchise agreement and ensuring the business’s success within the franchise system. This plan outlines the franchisee’s commitment to brand standards, marketing efforts, and operational procedures, while also addressing local market conditions and opportunities. By creating a solid franchise business plan, entrepreneurs can demonstrate their ability to effectively manage and grow their franchise, increasing the likelihood of a successful partnership with the franchisor.
How to Write a Business Plan
Embarking on the journey of creating a successful business requires a solid foundation, and a well-crafted business plan is the cornerstone. Here is the process of writing a comprehensive business plan and the main parts of a winning business plan . From setting objectives to conducting market research, this guide will have everything you need.
Executive Summary

The Executive Summary serves as the gateway to your business plan, offering a snapshot of your venture’s core aspects. This section should captivate and inform, succinctly summarizing the essence of your plan.
It’s crucial to include a clear mission statement, a brief description of your primary products or services, an overview of your target market, and key financial projections or achievements.
Think of it as an elevator pitch in written form: it should be compelling enough to engage potential investors or stakeholders and provide them with a clear understanding of what your business is about, its goals, and why it’s a promising investment.
Example: EcoTech is a technology company specializing in eco-friendly and sustainable products designed to reduce energy consumption and minimize waste. Our mission is to create innovative solutions that contribute to a cleaner, greener environment.
Our target market includes environmentally conscious consumers and businesses seeking to reduce their carbon footprint. We project a 200% increase in revenue within the first three years of operation.
Overview and Business Objectives

In the Overview and Business Objectives section, outline your business’s core goals and the strategic approaches you plan to use to achieve them. This section should set forth clear, specific objectives that are attainable and time-bound, providing a roadmap for your business’s growth and success.
It’s important to detail how these objectives align with your company’s overall mission and vision. Discuss the milestones you aim to achieve and the timeframe you’ve set for these accomplishments.
This part of the plan demonstrates to investors and stakeholders your vision for growth and the practical steps you’ll take to get there.
Example: EcoTech’s primary objective is to become a market leader in sustainable technology products within the next five years. Our key objectives include:
- Introducing three new products within the first two years of operation.
- Achieving annual revenue growth of 30%.
- Expanding our customer base to over 10,000 clients by the end of the third year.
Company Description

The Company Description section is your opportunity to delve into the details of your business. Provide a comprehensive overview that includes your company’s history, its mission statement, and its vision for the future.
Highlight your unique selling proposition (USP) – what makes your business stand out in the market. Explain the problems your company solves and how it benefits your customers.
Include information about the company’s founders, their expertise, and why they are suited to lead the business to success. This section should paint a vivid picture of your business, its values, and its place in the industry.
Example: Founded in 2023, EcoTech is committed to developing cutting-edge sustainable technology products that benefit both the environment and our customers. Our unique combination of innovative solutions and eco-friendly design sets us apart from the competition. We envision a future where technology and sustainability go hand in hand, leading to a greener planet.
Define Your Target Market

Defining Your Target Market is critical for tailoring your business strategy effectively. This section should describe your ideal customer base in detail, including demographic information (such as age, gender, income level, and location) and psychographic data (like interests, values, and lifestyle).
Elucidate on the specific needs or pain points of your target audience and how your product or service addresses these. This information will help you know your target market and develop targeted marketing strategies.
Example: Our target market comprises environmentally conscious consumers and businesses looking for innovative solutions to reduce their carbon footprint. Our ideal customers are those who prioritize sustainability and are willing to invest in eco-friendly products.
Market Analysis

The Market Analysis section requires thorough research and a keen understanding of the industry. It involves examining the current trends within your industry, understanding the needs and preferences of your customers, and analyzing the strengths and weaknesses of your competitors.
This analysis will enable you to spot market opportunities and anticipate potential challenges. Include data and statistics to back up your claims, and use graphs or charts to illustrate market trends.
This section should demonstrate that you have a deep understanding of the market in which you operate and that your business is well-positioned to capitalize on its opportunities.
Example: The market for eco-friendly technology products has experienced significant growth in recent years, with an estimated annual growth rate of 10%. As consumers become increasingly aware of environmental issues, the demand for sustainable solutions continues to rise.
Our research indicates a gap in the market for high-quality, innovative eco-friendly technology products that cater to both individual and business clients.
SWOT Analysis

A SWOT analysis in your business plan offers a comprehensive examination of your company’s internal and external factors. By assessing Strengths, you showcase what your business does best and where your capabilities lie.
Weaknesses involve an honest introspection of areas where your business may be lacking or could improve. Opportunities can be external factors that your business could capitalize on, such as market gaps or emerging trends.
Threats include external challenges your business may face, like competition or market changes. This analysis is crucial for strategic planning, as it helps in recognizing and leveraging your strengths, addressing weaknesses, seizing opportunities, and preparing for potential threats.
Including a SWOT analysis demonstrates to stakeholders that you have a balanced and realistic understanding of your business in its operational context.
- Innovative and eco-friendly product offerings.
- Strong commitment to sustainability and environmental responsibility.
- Skilled and experienced team with expertise in technology and sustainability.
Weaknesses:
- Limited brand recognition compared to established competitors.
- Reliance on third-party manufacturers for product development.
Opportunities:
- Growing consumer interest in sustainable products.
- Partnerships with environmentally-focused organizations and influencers.
- Expansion into international markets.
- Intense competition from established technology companies.
- Regulatory changes could impact the sustainable technology market.
Competitive Analysis

In this section, you’ll analyze your competitors in-depth, examining their products, services, market positioning, and pricing strategies. Understanding your competition allows you to identify gaps in the market and tailor your offerings to outperform them.
By conducting a thorough competitive analysis, you can gain insights into your competitors’ strengths and weaknesses, enabling you to develop strategies to differentiate your business and gain a competitive advantage in the marketplace.
Example: Key competitors include:
GreenTech: A well-known brand offering eco-friendly technology products, but with a narrower focus on energy-saving devices.
EarthSolutions: A direct competitor specializing in sustainable technology, but with a limited product range and higher prices.
By offering a diverse product portfolio, competitive pricing, and continuous innovation, we believe we can capture a significant share of the growing sustainable technology market.
Organization and Management Team

Provide an overview of your company’s organizational structure, including key roles and responsibilities. Introduce your management team, highlighting their expertise and experience to demonstrate that your team is capable of executing the business plan successfully.
Showcasing your team’s background, skills, and accomplishments instills confidence in investors and other stakeholders, proving that your business has the leadership and talent necessary to achieve its objectives and manage growth effectively.
Example: EcoTech’s organizational structure comprises the following key roles: CEO, CTO, CFO, Sales Director, Marketing Director, and R&D Manager. Our management team has extensive experience in technology, sustainability, and business development, ensuring that we are well-equipped to execute our business plan successfully.
Products and Services Offered

Describe the products or services your business offers, focusing on their unique features and benefits. Explain how your offerings solve customer pain points and why they will choose your products or services over the competition.
This section should emphasize the value you provide to customers, demonstrating that your business has a deep understanding of customer needs and is well-positioned to deliver innovative solutions that address those needs and set your company apart from competitors.
Example: EcoTech offers a range of eco-friendly technology products, including energy-efficient lighting solutions, solar chargers, and smart home devices that optimize energy usage. Our products are designed to help customers reduce energy consumption, minimize waste, and contribute to a cleaner environment.
Marketing and Sales Strategy

In this section, articulate your comprehensive strategy for reaching your target market and driving sales. Detail the specific marketing channels you plan to use, such as social media, email marketing, SEO, or traditional advertising.
Describe the nature of your advertising campaigns and promotional activities, explaining how they will capture the attention of your target audience and convey the value of your products or services. Outline your sales strategy, including your sales process, team structure, and sales targets.
Discuss how these marketing and sales efforts will work together to attract and retain customers, generate leads, and ultimately contribute to achieving your business’s revenue goals.
This section is critical to convey to investors and stakeholders that you have a well-thought-out approach to market your business effectively and drive sales growth.
Example: Our marketing strategy includes digital advertising, content marketing, social media promotion, and influencer partnerships. We will also attend trade shows and conferences to showcase our products and connect with potential clients. Our sales strategy involves both direct sales and partnerships with retail stores, as well as online sales through our website and e-commerce platforms.
Logistics and Operations Plan

The Logistics and Operations Plan is a critical component that outlines the inner workings of your business. It encompasses the management of your supply chain, detailing how you acquire raw materials and manage vendor relationships.
Inventory control is another crucial aspect, where you explain strategies for inventory management to ensure efficiency and reduce wastage. The section should also describe your production processes, emphasizing scalability and adaptability to meet changing market demands.
Quality control measures are essential to maintain product standards and customer satisfaction. This plan assures investors and stakeholders of your operational competency and readiness to meet business demands.
Highlighting your commitment to operational efficiency and customer satisfaction underlines your business’s capability to maintain smooth, effective operations even as it scales.
Example: EcoTech partners with reliable third-party manufacturers to produce our eco-friendly technology products. Our operations involve maintaining strong relationships with suppliers, ensuring quality control, and managing inventory.
We also prioritize efficient distribution through various channels, including online platforms and retail partners, to deliver products to our customers in a timely manner.
Financial Projections Plan

In the Financial Projections Plan, lay out a clear and realistic financial future for your business. This should include detailed projections for revenue, costs, and profitability over the next three to five years.
Ground these projections in solid assumptions based on your market analysis, industry benchmarks, and realistic growth scenarios. Break down revenue streams and include an analysis of the cost of goods sold, operating expenses, and potential investments.
This section should also discuss your break-even analysis, cash flow projections, and any assumptions about external funding requirements.
By presenting a thorough and data-backed financial forecast, you instill confidence in potential investors and lenders, showcasing your business’s potential for profitability and financial stability.
This forward-looking financial plan is crucial for demonstrating that you have a firm grasp of the financial nuances of your business and are prepared to manage its financial health effectively.
Example: Over the next three years, we expect to see significant growth in revenue, driven by new product launches and market expansion. Our financial projections include:
- Year 1: $1.5 million in revenue, with a net profit of $200,000.
- Year 2: $3 million in revenue, with a net profit of $500,000.
- Year 3: $4.5 million in revenue, with a net profit of $1 million.
These projections are based on realistic market analysis, growth rates, and product pricing.
Income Statement

The income statement , also known as the profit and loss statement, provides a summary of your company’s revenues and expenses over a specified period. It helps you track your business’s financial performance and identify trends, ensuring you stay on track to achieve your financial goals.
Regularly reviewing and analyzing your income statement allows you to monitor the health of your business, evaluate the effectiveness of your strategies, and make data-driven decisions to optimize profitability and growth.
Example: The income statement for EcoTech’s first year of operation is as follows:
- Revenue: $1,500,000
- Cost of Goods Sold: $800,000
- Gross Profit: $700,000
- Operating Expenses: $450,000
- Net Income: $250,000
This statement highlights our company’s profitability and overall financial health during the first year of operation.
Cash Flow Statement

A cash flow statement is a crucial part of a financial business plan that shows the inflows and outflows of cash within your business. It helps you monitor your company’s liquidity, ensuring you have enough cash on hand to cover operating expenses, pay debts, and invest in growth opportunities.
By including a cash flow statement in your business plan, you demonstrate your ability to manage your company’s finances effectively.
Example: The cash flow statement for EcoTech’s first year of operation is as follows:
Operating Activities:
- Depreciation: $10,000
- Changes in Working Capital: -$50,000
- Net Cash from Operating Activities: $210,000
Investing Activities:
- Capital Expenditures: -$100,000
- Net Cash from Investing Activities: -$100,000
Financing Activities:
- Proceeds from Loans: $150,000
- Loan Repayments: -$50,000
- Net Cash from Financing Activities: $100,000
- Net Increase in Cash: $210,000
This statement demonstrates EcoTech’s ability to generate positive cash flow from operations, maintain sufficient liquidity, and invest in growth opportunities.
Tips on Writing a Business Plan

1. Be clear and concise: Keep your language simple and straightforward. Avoid jargon and overly technical terms. A clear and concise business plan is easier for investors and stakeholders to understand and demonstrates your ability to communicate effectively.
2. Conduct thorough research: Before writing your business plan, gather as much information as possible about your industry, competitors, and target market. Use reliable sources and industry reports to inform your analysis and make data-driven decisions.
3. Set realistic goals: Your business plan should outline achievable objectives that are specific, measurable, attainable, relevant, and time-bound (SMART). Setting realistic goals demonstrates your understanding of the market and increases the likelihood of success.
4. Focus on your unique selling proposition (USP): Clearly articulate what sets your business apart from the competition. Emphasize your USP throughout your business plan to showcase your company’s value and potential for success.
5. Be flexible and adaptable: A business plan is a living document that should evolve as your business grows and changes. Be prepared to update and revise your plan as you gather new information and learn from your experiences.
6. Use visuals to enhance understanding: Include charts, graphs, and other visuals to help convey complex data and ideas. Visuals can make your business plan more engaging and easier to digest, especially for those who prefer visual learning.
7. Seek feedback from trusted sources: Share your business plan with mentors, industry experts, or colleagues and ask for their feedback. Their insights can help you identify areas for improvement and strengthen your plan before presenting it to potential investors or partners.
FREE Business Plan Template
To help you get started on your business plan, we have created a template that includes all the essential components discussed in the “How to Write a Business Plan” section. This easy-to-use template will guide you through each step of the process, ensuring you don’t miss any critical details.
The template is divided into the following sections:
- Mission statement
- Business Overview
- Key products or services
- Target market
- Financial highlights
- Company goals
- Strategies to achieve goals
- Measurable, time-bound objectives
- Company History
- Mission and vision
- Unique selling proposition
- Demographics
- Psychographics
- Pain points
- Industry trends
- Customer needs
- Competitor strengths and weaknesses
- Opportunities
- Competitor products and services
- Market positioning
- Pricing strategies
- Organizational structure
- Key roles and responsibilities
- Management team backgrounds
- Product or service features
- Competitive advantages
- Marketing channels
- Advertising campaigns
- Promotional activities
- Sales strategies
- Supply chain management
- Inventory control
- Production processes
- Quality control measures
- Projected revenue
- Assumptions
- Cash inflows
- Cash outflows
- Net cash flow
Using Business Plan Software

Creating a comprehensive business plan can be intimidating, but business plan software can streamline the process and help you produce a professional document. These tools offer a number of benefits, including guided step-by-step instructions, financial projections, and industry-specific templates. Here are the top 5 business plan software options available to help you craft a great business plan.
1. LivePlan
LivePlan is a popular choice for its user-friendly interface and comprehensive features. It offers over 500 sample plans, financial forecasting tools, and the ability to track your progress against key performance indicators. With LivePlan, you can create visually appealing, professional business plans that will impress investors and stakeholders.
2. Upmetrics
Upmetrics provides a simple and intuitive platform for creating a well-structured business plan. It features customizable templates, financial forecasting tools, and collaboration capabilities, allowing you to work with team members and advisors. Upmetrics also offers a library of resources to guide you through the business planning process.
Bizplan is designed to simplify the business planning process with a drag-and-drop builder and modular sections. It offers financial forecasting tools, progress tracking, and a visually appealing interface. With Bizplan, you can create a business plan that is both easy to understand and visually engaging.
Enloop is a robust business plan software that automatically generates a tailored plan based on your inputs. It provides industry-specific templates, financial forecasting, and a unique performance score that updates as you make changes to your plan. Enloop also offers a free version, making it accessible for businesses on a budget.
5. Tarkenton GoSmallBiz
Developed by NFL Hall of Famer Fran Tarkenton, GoSmallBiz is tailored for small businesses and startups. It features a guided business plan builder, customizable templates, and financial projection tools. GoSmallBiz also offers additional resources, such as CRM tools and legal document templates, to support your business beyond the planning stage.
Business Plan FAQs
What is a good business plan.
A good business plan is a well-researched, clear, and concise document that outlines a company’s goals, strategies, target market, competitive advantages, and financial projections. It should be adaptable to change and provide a roadmap for achieving success.
What are the 3 main purposes of a business plan?
The three main purposes of a business plan are to guide the company’s strategy, attract investment, and evaluate performance against objectives. Here’s a closer look at each of these:
- It outlines the company’s purpose and core values to ensure that all activities align with its mission and vision.
- It provides an in-depth analysis of the market, including trends, customer needs, and competition, helping the company tailor its products and services to meet market demands.
- It defines the company’s marketing and sales strategies, guiding how the company will attract and retain customers.
- It describes the company’s organizational structure and management team, outlining roles and responsibilities to ensure effective operation and leadership.
- It sets measurable, time-bound objectives, allowing the company to plan its activities effectively and make strategic decisions to achieve these goals.
- It provides a comprehensive overview of the company and its business model, demonstrating its uniqueness and potential for success.
- It presents the company’s financial projections, showing its potential for profitability and return on investment.
- It demonstrates the company’s understanding of the market, including its target customers and competition, convincing investors that the company is capable of gaining a significant market share.
- It showcases the management team’s expertise and experience, instilling confidence in investors that the team is capable of executing the business plan successfully.
- It establishes clear, measurable objectives that serve as performance benchmarks.
- It provides a basis for regular performance reviews, allowing the company to monitor its progress and identify areas for improvement.
- It enables the company to assess the effectiveness of its strategies and make adjustments as needed to achieve its objectives.
- It helps the company identify potential risks and challenges, enabling it to develop contingency plans and manage risks effectively.
- It provides a mechanism for evaluating the company’s financial performance, including revenue, expenses, profitability, and cash flow.
Can I write a business plan by myself?
Yes, you can write a business plan by yourself, but it can be helpful to consult with mentors, colleagues, or industry experts to gather feedback and insights. There are also many creative business plan templates and business plan examples available online, including those above.
We also have examples for specific industries, including a using food truck business plan , salon business plan , farm business plan , daycare business plan , and restaurant business plan .
Is it possible to create a one-page business plan?
Yes, a one-page business plan is a condensed version that highlights the most essential elements, including the company’s mission, target market, unique selling proposition, and financial goals.
How long should a business plan be?
A typical business plan ranges from 20 to 50 pages, but the length may vary depending on the complexity and needs of the business.
What is a business plan outline?
A business plan outline is a structured framework that organizes the content of a business plan into sections, such as the executive summary, company description, market analysis, and financial projections.
What are the 5 most common business plan mistakes?
The five most common business plan mistakes include inadequate research, unrealistic financial projections, lack of focus on the unique selling proposition, poor organization and structure, and failure to update the plan as circumstances change.
What questions should be asked in a business plan?
A business plan should address questions such as: What problem does the business solve? Who is the specific target market ? What is the unique selling proposition? What are the company’s objectives? How will it achieve those objectives?
What’s the difference between a business plan and a strategic plan?
A business plan focuses on the overall vision, goals, and tactics of a company, while a strategic plan outlines the specific strategies, action steps, and performance measures necessary to achieve the company’s objectives.
How is business planning for a nonprofit different?
Nonprofit business planning focuses on the organization’s mission, social impact, and resource management, rather than profit generation. The financial section typically includes funding sources, expenses, and projected budgets for programs and operations.
Image: Envato Elements

Your email address will not be published. Required fields are marked *
© Copyright 2003 - 2023, Small Business Trends LLC. All rights reserved. "Small Business Trends" is a registered trademark.
Free Agriculture Sample Business Plan PDF + How to Write
Elon Glucklich
6 min. read
Updated November 28, 2023
Free Download: Agriculture Business Plan Template
As a farmer, you’re in the business of putting food on the table. Agriculture is one of the world’s oldest professions.
Today it accounts for over 5% of U.S. Gross Domestic Product, and 1 in 10 American workers are in agriculture, food, and related industries.
But starting a new agriculture business requires intensive planning and upfront preparation. If you’re looking for a free, downloadable agriculture sample business plan PDF to help you create a business plan of your own, look no further.
Keep in mind that you don’t need to find a sample business plan that exactly matches your farm. Whether you’re launching a larger agricultural business outside a bustling city or a smaller organic operation, the details will be different, but the foundation of the plan will be the same.
Are you writing a business plan for your farm because you’re seeking a loan? Is your primary concern outlining a clear path for sales growth? Either way, you’re going to want to edit and customize it so it fits your particular farm.
No two agriculture farming businesses are alike.
For example, your strategy will be very different if you’re a dairy operation instead of a soybean farm. So take the time to create your own financial forecasts and do enough market research for your specific type of agriculture so you have a solid plan for success.
- What should you include in an agriculture farm business plan?
Your agriculture business plan doesn’t need to be hundreds of pages—keep it as short and focused as you can. You’ll probably want to include each of these sections:
1. Executive summary
An overview of your agriculture business, with a brief description of your products or services, your legal structure, and a snapshot of your future plans. While it’s the first part of the plan, it’s often easier to write your executive summary last.
2. Business summary and funding needs
Details about your farming operation, including how much capital you will need and the types of funding you’re considering. Include your business history, your current state, and your future projections. It should also cover your business location, the equipment and facilities needed, and the kinds of crops or livestock you plan to raise.
What’s your biggest business challenge right now?
3. products and services.
Provide details on the types of crops, farming methods, and any value-added products you plan to offer, such as finished goods or even agritourism offerings .
4. Marketing plan
Compile your market research findings, including the demand for your products or services, your target customers , and your competitors. It should also outline your marketing strategy—how you plan to attract and retain customers.
5. Financial plan
Your revenue projections, cost estimates, and break-even analysis. Your financial plan and forecasts should demonstrate that your business has a path to profitability.
- Building on your farm business plan sample
With a free agriculture business plan template as your starting point, you can start chipping away at the unique elements of your business plan.
As the business owner, only you can speak to aspects of your agriculture operation like your mission and core values.
You’re putting in the long hours to start a thriving farm business, so aspects of your mission – like a commitment to sustainable farming practices – will be best explained in your own words. Authenticity will help you connect with a growing market of consumers who value transparency and environmental stewardship in their food sources.
As for more conventional aspects of business planning , you will want to take on things like your marketing and financial plans one at a time. Here are a few specific areas to focus on when writing your business plan.
Invest time in market research
Starting an agriculture operation requires significant startup costs. When you throw in the unique land use considerations involved, it’s crucial to conduct thorough market research before investing hundreds of thousands – or even millions – of dollars into a farm business.
Start by researching the types of farms operating in your locality and wider region, and the specific crops or livestock they specialize in. You will need to understand seasonal trends, including crop yields and livestock productivity.
Note the demographics of the local community to understand their buying habits and preference for local produce. Also, be aware of the competitive landscape and how your farm can differentiate itself from others. All of this information will inform your service, pricing, marketing, and partnership strategy.
From there, you can outline how you plan to reach your target market and promote your farm’s offerings.
Craft your agriculture go-to-market strategy
One of the things that makes an agriculture farm business plan different from some service-based business plans is that you might decide to work only with one or two businesses that purchase your goods.
You may offer different tiers of products to different types of buyers, such as produce for an organic farmers market, and corn for another farm’s animal feed. If that’s the case, make sure you include ideas like setting aside land for organic growth and maintenance.
Discuss your advertising and promotional strategies, emphasizing channels relevant to your target market. Also, consider how partnerships with local businesses, farmers’ markets, and other industry stakeholders can enhance your visibility.
Include your pricing strategy and any special promotions or loyalty programs. Also, consider public relations and media outreach efforts that can raise awareness about your farm and its sustainable practices.
Prepare for unique farming challenges
Running an agricultural business comes with its own set of challenges, including weather-related disruptions and market volatility. Your business plan should identify these potential risks and present contingency plans to address them.
Include a plan to mitigate weather-related risks, such as crop diversification, employing weather-resistant farming practices, investing in appropriate infrastructure like greenhouses or drainage systems, or taking out insurance to cover weather-related losses.
Detail the operational aspects of your business , including land ownership, employee status, farm maintenance, and safety requirements. Also, illustrate your strategies for managing crop production, livestock care, land stewardship, and regulatory compliance.
Plan for the future
Contingency planning is important in all businesses.
But the unique challenges in agriculture of changing market dynamics, regulatory changes, and climate impacts make it especially necessary to plan for the future. Detail how you’ll measure success, and how you will be prepared to adapt your offerings if you need to change the focus of the business due to factors outside your control.
Also, be ready to discuss opportunities for scaling your business over time, such as introducing new crops, expanding farm operations, or opening additional locations.
- Get started with your farm business plan sample
There are obviously plenty of reasons farm owners can benefit from writing a business plan — for example, you’ll need one if you’re seeking a loan or investment. Even if you’re not seeking funding, the process of thinking through every aspect of your business will help you make sure you’re not overlooking anything critical as you grow.
Download this agriculture farm sample business plan PDF for free right now, or visit Bplans’ gallery of more than 550 sample business plans if you’re looking for more options.

See why 1.2 million entrepreneurs have written their business plans with LivePlan
Elon is a marketing specialist at Palo Alto Software, working with consultants, accountants, business instructors and others who use LivePlan at scale. He has a bachelor's degree in journalism and an MBA from the University of Oregon.

Table of Contents
Related Articles

10 Min. Read
How to Write a Small Restaurant Business Plan + Template

2 Min. Read
Why You Should Care about Intellectual Property

5 Min. Read
How to Write a Growth-Oriented Business Plan

8 Min. Read
What Type of Business Plan Do You Need?
The LivePlan Newsletter
Become a smarter, more strategic entrepreneur.
Your first monthly newsetter will be delivered soon..
We are sorry, this form is not available to you as you have declined marketing cookies.
Unsubscribe anytime. Privacy policy .

The quickest way to turn a business idea into a business plan
Fill-in-the-blanks and automatic financials make it easy.
No thanks, I prefer writing 40-page documents.
Flash Sale. 40% Off the #1 rated business plan builder

Complete Sample Business Plan Template in Seconds with PDFSimpli.

November 16, 2018 by Sean Fitzpatrick
What is a Sample Business Plan Template?
- 1 What is a Sample Business Plan Template?
- 2 How To Fill Out Sample Business Plan Template with PDFSimpli in Five Steps?
- 3.1 Can I Turn Sample Business Plan Template Into An Image?
- 3.2 Can I Convert Sample Business Plan Template to a Word Document?
- 3.3 How Do I Print Sample Business Plan Template?
- 3.4 Shoot – I Made a Bunch of Mistakes. How Do I Reset Sample Business Plan Template or Another Form?
- 3.5 How Do I Add Text to Sample Business Plan Template?
- 3.6 Can I Fill a Form Field?
- 3.7 I Made a Few Boo-Boos. How Do I Erase a Mistake?
- 3.8 Can I Sign Sample Business Plan Template?
- 3.9 I Want to Highlight Some Items in Sample Business Plan Template. Can I Do That?
- 3.10 How Do I Add a Watermark to Sample Business Plan Template?
- 3.11 AHHH!!! My PDF is Upside Down. Can I Rotate?
- 3.12 How Do I Download a Copy of Sample Business Plan Template?
- 3.13 How Many Versions of Sample Business Plan Template Can I Save?
- 3.14 Can I Merge Sample Business Plan Template with Another PDF?
- 3.15 I Want to Compress the Sample Business Plan Template – Can I Do That With PDFSimpli?
- 3.16 Wait a Minute… Can I Turn This Into a PowerPoint?
- 3.17 How Much Does This Amazing PDFSimpli Cost?
- 3.18 You Telling Me This is All Free?
- 3.19 Who Do I Contact For Technical Support
A sample business plan template is a pdf form that can be filled out, edited or modified by anyone online. PDF (Portable Document Format) is a file format that captures all the elements of a printed document as an electronic image that you can view, navigate, print, or forward to someone else. PDF files are created using Adobe Acrobat or PDFSimpli . PDF files are more than images of documents. Portable Document Format (PDF) is a file format used to present and exchange documents reliably, independent of software, hardware, or operating system. Invented by Adobe, PDF is now an open standard maintained by the International Organization for Standardization (ISO).
PDF files can contain not only images and text, but also interactive buttons, hyperlinks and embedded fonts. They can also include interactive elements such as buttons for forms entry and for triggering sound and Quicktime or AVI movies. PDF files are optimized for the Web by rendering text before graphic images and hypertext links.
Free-to-use online PDF editors, such as PDFSimpli, that make it really easy to fill out forms, like ones you sometimes see on a job application or a tax form. Just upload your PDF to the website to do things like insert images, text, signatures, links, and more, and then download it back to your computer as a PDF.

Protected By

What people are saying

Awesome! User friendly would recommend to anyone

Great! A+ experience. Would definitely recommend to others.

Worked perfectly, and fast! Super easy too, I just needed to drag and drop and click a single button!
Business growth
Business tips
How to create a goal-crushing project plan (+ 13 templates)
These project plan templates will prepare you for a smooth project..

If I learned anything from my borderline unhealthy obsession with "The Price is Right," it's that you can't underestimate the power of a good plan. Convinced I was just a hop, skip, and a "Come on down!" away from Showcase Showdown glory, I drafted a meticulous battle plan for how I would crush all the people who think a toaster oven costs the same as a Camry.
Even if the most meticulously laid plans are at the mercy of a capricious host with a skinny microphone, starting with a project plan template lays a foundation of order and direction in a world where the rules are made up and the points don't matter. (Wait, wrong show.)
In this post, I'll show you how the right project plan template can bring that same level of preparedness to your professional projects.
Table of contents:
What is a project plan template?
13 free project plan templates, who uses the project plan template, how to create a project plan in 7 steps, automate your project plan, what is a project plan.
A project plan is a formal document that details how a project will be executed by outlining the purpose, resources, scope, timeline, and deliverables required to complete said project. It guides teams on what the project is supposed to achieve, helps them communicate, keeps track of goals, decisions, and changes, and monitors progress.
The project plan isn't just a roadmap for how to proceed; it's also a vital tool for managing risk, ensuring clarity and transparency, and serving as a communication medium between all stakeholders. It provides a foundation for subsequent detailed planning, such as resource allocation and scheduling, and is essential for maintaining control over the project's progression.
Put simply: imagine trying to whip up a soufflé for the first time without a recipe. You might end up with a deflated mess and egg on your face (possibly literally). A project plan ensures you won't need a towel.
What does a project plan look like?
A project plan can take various forms, depending on the project's needs and complexity. It might be a comprehensive multi-page document detailing every phase, milestone, and activity or a succinct one-pager for smaller projects. Visual representations like a Gantt chart are often used to depict task sequences and dependencies, highlighting how different tasks interlink and the project's overall workflow.
Who crafts a project plan?
The project manager or a dedicated project planning team is responsible for crafting a project plan. This team must deeply understand the project's objectives, constraints, and the steps required to complete it successfully. Creating a project plan involves a series of strategic decisions, such as defining project phases and milestones, setting up timelines, and breaking the project into bite-size pieces, so the team doesn't choke on ambition.
A project plan template is a pre-formatted document that serves as a starting point for outlining the approach to a project. It typically includes sections for the project scope, objectives, timelines, resource allocation, risk assessment, and communication strategies (unless telepathy is in the budget).
These templates are vital, as they offer a structured framework ensuring consistency and thorough planning. They help avoid overlooking critical elements, streamline the planning process, and increase productivity, all while facilitating clear communication, aligning stakeholders, and setting a clear path to project completion. By using one, you're basically copying off the smart kid in class—you'll hit all the marks without having to think too hard.
Why reinvent the wheel when someone else has already done the heavy lifting for you? In a gracious act of charity, I present to you not one, not two, but 13 free project management templates. (Don't thank me too much—my design team made them.) Feel free to use them as is or, if you're feeling fancy, jazz them up with your own branding and visual elements.
1. Project proposal template

A project proposal template provides a standardized format for outlining a project's objectives, scope, methodology, and resources. Aimed at persuading stakeholders or clients to approve and fund the project, think of this project management plan template as your first date outfit—designed to impress, communicate your best attributes, and get a "yes" to that second date or, in this case, the green light on your project.
2. Project kickoff meeting template

A project kickoff meeting agenda is a guide that outlines the important topics to tackle during an initial meeting with project stakeholders to align goals, expectations, roles, and timelines for a new project. It's your project's pilot episode, where you introduce the cast of characters, set the scene, and tease the drama that'll unfold as your plan comes to life.
3. Project brief template

A project brief template is your project's elevator pitch on paper—a short, snappy document that tells everyone on the elevator (team members and stakeholders) why they should care about what you're doing before they reach their floor.
4. Gantt chart project plan template

A Gantt chart project plan template is a visual tool that outlines a project schedule, showing the start and finish dates of elements within the project and how they relate to each other over time. It's like a time-travel map for your project, visually plotting out your tasks in a way Doc Brown would appreciate.
5. Project communications plan template

A project communications plan template outlines the strategies, methods, frequency, and responsibilities for all communications within a project, ensuring no wires get crossed.
6. Business case template

A business case template is a bit like your project's resume. It highlights the skills (benefits), experience (costs), and special zing (risks and rewards) to convince the big bosses to hire (approve) your project.
7. Risk management project plan template

A risk management project plan template is designed to identify potential risks in a project, analyze their impact, and outline mitigation strategies to ensure project continuity. It's your project's horror movie survival guide, except instead of avoiding chainsaw-wielding maniacs, you're sidestepping budget blowouts and timeline traps.
8. Project activity template

A project activity template is like a chore chart for grown-ups, detailing who's doing what, where, and when—hopefully without the bribery of gold stars and ice cream.
9. Project budget allocation template

A project budget allocation template provides a structured approach to estimate the costs associated with various aspects of a project, helping to manage and distribute financial resources appropriately.
10. Project status report template

A project status report template summarizes a project's progress, risks, and issues, keeping stakeholders informed about its current state. It's basically your project's report card.
11. Resource management project plan template

A resource management project plan template helps plan, allocate, and schedule the resources needed to complete a project.
12. Project monthly monitoring template

A project monthly monitoring template is used to track the project's progression, financial status, and performance metrics systematically every month. It's like a monthly diary entry for your project but with fewer feelings.
13. Project change request template

A project change request template is a formal document that outlines a request for a change in the project, detailing the nature of the change, its impacts, and justification. This is the polite way of saying, "Hey, I know what we agreed on, but I've had a better (or more terrifying) idea, and here's a form filled out in triplicate about why we should do it."
A project planning template and the resulting project plan are used by a bunch of folks involved in the project's lifespan.
Project managers: Armed with a template and a dream, project managers are responsible for creating a clear and comprehensive project plan. They're constantly checking the plan like it's a newborn baby to make sure everything's on track and no one has accidentally dropped the project on its head.
Project team: These are the folks in the trenches who use the plan throughout the project execution phase. It helps them understand their roles, responsibilities, and timelines, providing a clear path to follow.
Subject matter experts: These are the brainiacs you call when you can't figure out how to fit that last puzzle piece. Their expertise helps in creating an accurate and feasible plan.
Stakeholders: These are the people, like clients and executives, who rely on the project plan for progress updates and a glimpse into the future of the project. It's as if they're trying to read tea leaves, discerning the fate of the project from the swirling patterns of tasks and deadlines.
Other departments: Depending on the nature of the project, departments like Finance, Marketing, or HR might also use the project plan template to align their activities with the project's scope and timeline.
The more these groups are involved in the plan creation and execution, the more collaborative and inclusive the project environment is. This effort also increases the likelihood of catching and rectifying any potential issues early in the project lifecycle, like a safety net made of collective brainpower and teamwork.
If you're the sort who likes to prep for a zombie apocalypse with a well-stocked pantry and a blunt object near every door, then you probably know the power of a good project plan. But drafting your own is a different story. These seven steps to banging out a project plan will make you feel like the boss of everything, including the undead.
1. Define the project scope and objectives
The project scope outlines the boundaries and limitations of the project, serving as a guideline to ensure the project doesn't deviate from its intended path. It helps in preventing scope creep, the sneaky goblin that eats your budget and poops out deadline delays.
Well-defined objectives offer a clear vision of what the project aims to achieve. They serve as a motivating factor for the project team, encouraging them to work toward a common goal. It's like gathering a group of first-graders and challenging them to build the world's tallest LEGO tower. Suddenly, their chaotic energy transforms into focused determination.
Additionally, objectives provide a benchmark against which you can measure the project's success. Making objectives as clear as my grandma's moonshine ensures that every decision and action taken aligns with the project's ultimate goals.
2. Identify key stakeholders and team members
Identifying key stakeholders and team members during project initiation is about as crucial as remembering to put on pants before leaving the house. Sure, you could wing it, but you'll likely encounter some uncomfortable situations and potential embarrassment along the way.
Stakeholders, like senior management and investors, have a vested interest in the project, and their input can be invaluable in shaping the project's direction. They provide resources, unique perspectives, and the uncanny ability to spot potential disasters from a mile away.
Team members are the fine folks who will bring your project plan to life, so make sure you know who's who and what they're responsible for. By doing this, you'll foster a sense of ownership and promote a collaborative work environment where everyone understands how their role contributes to the project's success.
3. Develop a work breakdown structure
A work breakdown structure (WBS) is a visual tool that breaks down all the work a project needs into smaller, more manageable parts. It's like that weird quote about eating an elephant. You wouldn't just shove the whole thing in your mouth, right? You'd start with small bites. The WBS is your fork and knife in this elephant-sized project feast.
Starting with the top level representing the overall project goal, each step down the hierarchy gets more detailed. The last level of the WBS is where you'll find measurable, actionable tasks.
4. Create a project timeline
Once all tasks have been created and organized in the WBS, you'll have to start estimating how long each task is going to take. It's a bit like guessing how many jelly beans are in the jar at a carnival, but with more spreadsheets. Assign a time frame to the project and create a schedule, making sure to include a buffer to account for any potential delays and prevent the plan from falling apart.
It's always wise to use a Gantt chart or another form of a project flow chart for time planning. That way, you can spot task dependencies quickly, track progress like a pro, and shuffle things around when the project gremlins inevitably throw a wrench in your plans.
5. Allocate resources and set a budget
Proper allocation of resources—be it human or material—is of the utmost importance in any project. Identifying these resources for each task helps ensure the project runs smoothly and efficiently.
When it comes to human resources, it's about assigning the right people to the right tasks based on their skills and expertise. Think of it as a less romantic, more productivity-focused version of Tinder: swipe right if their skills match the task at hand, swipe left if they think Excel is a brand of gum. Material resources involve physical supplies or equipment required to complete each task. Basically, if it's tangible and you need it to get the job done, put it on the list.
You've got to make sure your financial ducks are in a row, so you're not left scraping the bottom of the piggy bank. This means predicting all the expenses likely to be incurred—from salaries and equipment to software licenses and those pesky overheads. Just imagine a crystal ball, but instead of mysterious smoke, it's filled with receipts, invoices, and the occasional moth flying out of your wallet.
6. Identify risks and communication strategy
In order to effectively manage the project, it's important to identify potential risks and develop a communication strategy. Some challenges or threats that could arise include budget constraints, resource limitations, and unforeseen technical issues. Conducting a risk assessment is like planning a picnic and assuming it'll rain, there will be ants, and at least one seagull attack. Once you've got your list of potential project-ruining catastrophes, come up with a contingency plan to either stop them from happening or deal with them if they do.
You should also determine your communication strategy, whether through emails, seances, yelling across the room, or other means. Decide how often you'll check in and who needs to be in the loop.
7. Review, approve, and monitor
At this stage, all aspects of the project plan are reviewed and scrutinized to ensure that every detail has been considered, including whether Mercury is in retrograde. The approval process involves sign-offs from key stakeholders to ensure everyone is on the same page.
Once your project is up and running, keep those plates spinning with regular check-ins because if one crashes, everyone's going to hear it. If something isn't going according to plan, be ready to whip out your duct tape and make some adjustments.
While the seven steps outlined can set you on the path to a well-structured project plan, leveraging existing software can streamline the process. If Google Docs and Sheets aren't your jam, check to see if an existing app you use (like Notion or Coda ) has a template that might work for you, either built-in or from the community surrounding the app.
And once you've built out your project plan, you can use Zapier to automate workflows and connect your favorite apps. Learn more about how to automate project management , or take a spin at the Big Wheel with one of these pre-built workflows to automate the project plan templates above.
Create Trello cards from new or updated Google Sheets rows

Create Asana tasks from updated Google Sheets rows

Copy data from new Google Sheets rows to a Google Doc template

Create Google Docs from a template for new Airtable records

Zapier is a no-code automation tool that lets you connect your apps into automated workflows, so that every person and every business can move forward at growth speed. Learn more about how it works .
Related reading:
How to automatically create documents from a template
Workflow management: Definition and best practices
The best project management software for small businesses
What is business process management (BPM)?
Get productivity tips delivered straight to your inbox
We’ll email you 1-3 times per week—and never share your information.

Allisa Boulette
Based in New England, Allisa is a content marketer and small business owner who hopes to make the internet a more interesting place than she found it. When she’s not working, you can find her lying very still not doing anything.
- Project management
Related articles

12 free invoice templates—and how to make your own
12 free invoice templates—and how to make...

How to implement proactive customer service (with real examples)
How to implement proactive customer service...

Net Promoter Score: A guide to NPS

11 actually great elevator pitch examples and how to make yours
11 actually great elevator pitch examples...
Improve your productivity automatically. Use Zapier to get your apps working together.

An official website of the United States government
Here’s how you know
Official websites use .gov A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS A lock ( Lock A locked padlock ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Sample business plans
About this document and download, translations, variations of this document.
- Version Rebecca's Plan-Traditional | File size: 245KB | Download .doc for Rebecca's Plan-Traditional /
- Version Andrew's Plan - Traditional | File size: 244KB | Download .doc for Andrew's Plan - Traditional /
- Version Andrew's Lean Business Plan | File size: 247KB | Download .doc for Andrew's Lean Business Plan /
Download translations
Disclaimer : Translations are for informational purposes only. Applications must be submitted in English.

IMAGES
VIDEO
COMMENTS
Customize Business Plan Templates Online. 100% Free. Print & Download Now! Create, Download, & Print A Business Plan - Simple Platform - Try Free Today!
1] Create A Custom Business Plan. 2] Download & Print - Professional, 100% Free! Fill Out A Business Plan In Minutes. Easy To Use, Save, & Print. Try Free Today!
Free PDF Business Plan Templates and Samples Get free Smartsheet templates By Joe Weller | September 9, 2020 We've gathered the most useful collection of business plan PDF templates and samples, including options for organizations of any size and type.
Content Business plans help you run your business A good business plan guides you through each stage of starting and managing your business. You'll use your business plan as a roadmap for how to structure, run, and grow your new business. It's a way to think through the key elements of your business.
Word | PDF This simple business plan template lays out each element of a traditional business plan to assist you as you build your own, and it provides space to add financing information for startups seeking funding. You can use and customize this simple business plan template to fit the needs for organizations of any size.
Download a free business plan in PDF or Word doc format to make writing a plan fast and easy Find Your Sample Plan Discover the sample plan that best fits your business. Search our gallery of over 550 sample business plans and find the one that's right for you. View the Gallery What You'll Get:
2.1 COMPANY BACKGROUND 2.2 MANAGEMENT TEAM 3. PRODUCTS AND SERVICES Here are some examples of our offerings: (insert images below) Currently, we use the following suppliers/vendors: 4. MARKET ANALYSIS 4.1 MARKET AND INDUSTRY OVERVIEW 4.2 TARGET MARKET
Use our downloadable free business plan template PDF to outline your company's goals and milestones, including how to structure, run, and grow your new business. Bring on investors or new business partners Use your powerful business plan to get funding or bring on new business partners.
What exactly am I selling? Equity, a business opportunity, a license? What do I want from my customer? Equity, loan (secured or unsecured), expertise or advice? The business plan is your sales tool. Make sure that you know what you are using this tool for and take time to develop it. The Business Plan Framework
Business plan template: There's an easier way to get your business plan done. Trending
Download template : One Page Business Plan Template Learn more : One Page Business Plan Template All Business Plans | PDF business templates. Browse through 5 of the best Business Plans | PDF business templates and find the right one for you.
656 templates Create a blank Business Plan B Beige Elegant Minimal Business Plan Executive Summary Document Document by BrandCraftery Navy and Gray Modern Business Plan Cover Document Document by Banuaa Startup Business Plan in Dark Green Lime Green Friendly Dynamic Style Document by Canva Creative Studio
With this business plan template, you'll be able to: Write a company description that sells your story. Plan for the future: lay out goals and metrics for success. Describe your product line in detail and plan for how to stand out from competitors. Consider any legal formalities that require attention when starting your business.
Company Policy Templates Construction Consulting Contracts Education Laundromat Business Plan Create your success roadmap with a laundromat business plan template, designed to arrange the essentials of the laundry business. 5-Year Business Plan Template Empower your path to long-term success with our 5-year business plan template.
Starting with a good business plan template (like this one) includes everything you need to get started. It helps you organize your thoughts, and provides guidance, instructions, and examples to create an investor-ready and SBA-approved business plan format. It really speeds up the planning process. Oh, and it's 100% free!
31 Templates Plans, strategies, roadmaps - Businesses rely on these things to gain perspective on what's about to happen.
Market analysis Competitive analysis Description of organizational management Description of product or services Marketing plan Sales strategy Funding details (or request for funding) Financial projections If your plan is particularly long or complicated, consider adding a table of contents or an appendix for reference.
Complete the Business Plan Template for a Startup Business to create a working business plan for your startup. Then, contact a SCORE mentor to review and refine your plan online or in person. To increase your odds of a successful business startup, download this step-by-step business plan template you can use to plan for your new business.
14 Business Plan Examples & Samples to Write Your Own (2023) 14 Professional Business Plan Examples or Samples Looking for business plan examples for inspiration? Download or view 14 professional business plans samples, vetted by MBA business plan writers. Available for download in PDF format or read like a book.
ZenBusiness 4.5
Write a business plan. Refer to the business plan template to better understand the business plan's components and find ideas and advice. Find inspiration for your business plan. Use the guide, the instructions, the glossary and an example of a plan provided with the template to help you along the way.
First Name * Last Name * Email * Phone Number * Website URL * Company Name * How many employees work there? * Subscribe to HubSpot's marketing blog We're committed to your privacy. HubSpot uses the information you provide to us to contact you about our relevant content, products, and services.
1.6 Exit Strategy Business Summary 2.1 Business Details
Tips on Writing a Business Plan. 1. Be clear and concise: Keep your language simple and straightforward. Avoid jargon and overly technical terms. A clear and concise business plan is easier for investors and stakeholders to understand and demonstrates your ability to communicate effectively.
You'll probably want to include each of these sections: 1. Executive summary. An overview of your agriculture business, with a brief description of your products or services, your legal structure, and a snapshot of your future plans. While it's the first part of the plan, it's often easier to write your executive summary last. 2.
A sample business plan template is a pdf form that can be filled out, edited or modified by anyone online. PDF (Portable Document Format) is a file format that captures all the elements of a printed document as an electronic image that you can view, navigate, print, or forward to someone else.
These seven steps to banging out a project plan will make you feel like the boss of everything, including the undead. 1. Define the project scope and objectives. The project scope outlines the boundaries and limitations of the project, serving as a guideline to ensure the project doesn't deviate from its intended path.
Sample business plans Traditional and Lean business plan templates for new small business owners. Translations Plan de negocio tradicional -Rebeca Plan de negocio tradicional -Andrew Plan de negocio ágil -Andrew Variations of this document Version Rebecca's Plan-Traditional | File size: 245KB | Download .doc